7 Oct, 2026FY2026 financial performance
Revenue rose 20.3% to R10.0bn from R8.3bn; HEPS increased to 95.8 cents from 72.3 cents.
Net asset value was 2,899 cents per share versus 2,862 cents; final dividend was 13 cents and total dividend was 33 cents.
Operating profit margin was 8.0% versus 7.3%; return on net operating assets was 50.2% versus 48.9%; net debt-to-equity ratio was 5.2% versus 5.7%.
Cash preservation remained a focus to strengthen the balance sheet.
Construction materials
Aggregates delivered improved product sales and operational efficiency; integration was completed, and non-core brick, block and readymix assets were divested.
R160m in divestiture proceeds was used to reduce debt; the project pipeline spans roads, rail, infrastructure, building and construction.
Aggregate demand is supported by public infrastructure, private building, residential development and renewable energy projects; fuel costs continued to weigh on margins.
Fly ash sales continued to perform strongly, including contributions from operations acquired in the Lafarge transaction.
Cement sales volume grew 36% and revenue 54%; clinker production increased 19% YoY, with thermal energy cost down 21% and startup fuel cost down 58% per ton of clinker.
Bulk commodities and industrial minerals
Iron ore domestic sales steadied in Q2 after erratic Q1 volumes; international sales faced weak realised Rand prices, while volumes remained ~15% below allocation.
Transnet's May 2026 10-day maintenance shutdown was its most successful in recent years; another 10-day shutdown was scheduled for October 2026.
A 240,000 tpa manganese allocation on the MECA III line was secured for seven years; FY27 exports were forecast at 240,000, with seven vessels confirmed.
Nkomati Anthracite Mine was ramping up; a reduced electricity tariff was approved for the ferrochrome industry, with two additional smelters expected to open by September or October.
Industrial minerals were being taken by ferrochrome smelters; agricultural lime demand was expected to rise during planting season.
Latest events from Afrimat
- Aggregates strength and cash generation cushioned steep H1 earnings pressure.AFT
H1 2027 - Diversification supports returns as weaker volumes test execution and integration.AFT
AGM 2024 presetation - Lafarge lifted revenue, but iron ore disruption and cement losses sharply reduced HEPS.AFT
H1 2025 - Lafarge integration lifted revenue, but cement losses and higher debt pressured returns.AFT
H2 2025 - Revenue grew 36.7% as priorities shift to operational gains and debt reduction.AFT
AGM 2025 presentation - Higher H1 earnings and Lafarge integration; H2 faces smelter and logistics risks.AFT
H1 2026 - Revenue grew 20.3%, as strong aggregates and cement recovery offset commodity headwinds.AFT