Capital position and returns

  • 2P reserves of 13.1 Mmboe; NPV10 of $393.6 million before tax and $312.4 million after tax, as of Dec. 31, 2025.

  • Q2 2026 revenue of $19.2 million and funds flow from operations of $14.1 million; enterprise value / annualized funds flow of 4.3x.

  • Q3 2026 quarterly dividend of $0.12 per share, representing a 7.2% yield; working capital net of debt was $6.1 million at June 30, 2026.

  • From July 2020 to June 2026, 51% of funds flow was reinvested and 47% returned to stakeholders; dividends represented 32% of allocation, with $75 million paid.

Operating performance and infrastructure

  • Q3 2026 field-estimated sales averaged 2,966 boepd, including 2,834 boepd in Brazil and 132 boepd in Canada; production mix was 89% natural gas.

  • Q2 2026 operating netback was $59.08/boe, or 86% of realized sales price; realized price was $68.72/boe and production and transportation expenses were $5.60/boe.

  • Q2 2026 effective royalty rate was 5.9% (Brazil 5.3%; Canada 14.8%); Brazil operating netback was $59.67/boe and Canada was $49.20/boe.

  • 100%-controlled pipelines and gas plant connect directly to the Bahiagás City Gate; the 2026 gas plant upgrade was completed in September.

  • Q2 2026 average realized natural gas price was $10.98/Mcf; the forecast weighted average price was $11.70/Mcf from Aug. 1, 2026, under the long-term contract.

Brazil growth plan

  • Caburé capacity was increased 33% to ~21 MMcfpd; four new wells were drilled in 2025, supporting a strong production base and free cash flow.

  • The 183-D1 Caruaçu development well was completed in three intervals and began production in August 2026; reported potential net pay was 47.7 metres, including 21.9 metres in Seq 6.1.

  • The 183-H2 well was drilled in the prospective Caruaçu structure and was being completed, with production expected in late October 2026; the 183-G2 development well was being drilled.

  • 2027 plans include a Caruaçu G-Pad development program and 183-C1 exploration well; 2028+ plans include full-field Caruaçu and Gomo development at Murucututu.

  • The 100%-owned Tucano Basin position covers 462.2 km²; infrastructure expansion is part of the near-term 2026 plan.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Alvopetro Energy