Beaver Creek presentation
Logotype for Andean Silver Limited

Andean Silver (ASL) Beaver Creek presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Andean Silver Limited

Beaver Creek presentation summary

2 Jun, 2026

Project overview and resource scale

  • Cerro Bayo project in Chile hosts a 91Moz AgEq resource with high grades of 342g/t AgEq, including multiple shallow, high-grade silver-gold lodes and significant exploration upside.

  • The project benefits from over A$150M in existing infrastructure, including a 500ktpa processing plant, water rights, power, and permitted tailings storage.

  • Multiple mining fronts are ready for rapid, low-cost restart, with both open pit and underground options and a history of strong metallurgical recoveries.

  • The land package covers over 400km² with district-scale exploration targets and more than 100Moz AgEq produced historically.

  • Resource growth is ongoing, with recent upgrades and continued drilling targeting further expansion.

Exploration and growth potential

  • Extensive surface outcrop veins and new high-grade discoveries, such as the Cristal and Pegaso 7 veins, highlight ongoing exploration success.

  • The Droughtmaster corridor and Los Domos zone offer significant regional upside, with high-grade polymetallic mineralization and walk-up drill targets.

  • The project area remains underexplored, with multiple untested vein corridors and a 26km strike system.

  • Two drill rigs are currently active, with plans to increase to four and a target of 40,000m drilling in FY25.

  • Historic production of 48.3Moz AgEq and new discoveries continue to add value.

Infrastructure and operational readiness

  • Infrastructure includes a 1,650tpd flotation plant, 12MW power facility, water rights for 815 l/s, and a deep-water port 100km away.

  • Six independent underground mines and over 30km of development are connected to power, water, and air.

  • Environmental approvals and a permitted tailings storage facility are in place, supporting a rapid restart.

  • Over A$6M in critical spares and equipment are available on site.

  • Skilled local workforce and proximity to the mining town of Chile Chico enhance operational efficiency.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more