Aspire Mining (AKM) Investor presentation summary
Event summary combining transcript, slides, and related documents.
Investor presentation summary
15 Oct, 2026Project scale and economics
JORC Coal Resource 219.4 Mt; Coal Reserve 130.1 Mt ROM, including 97.9 Mt marketable reserve; FM36 fat coking coal.
Production target stages from 1.5 to 2.5 to 5.0 Mtpa ROM, with a forecast ~31-year operating life.
Updated model forecasts US$1,483.3m post-tax NPV10, US$230/t long-term coal price and US$80.4/t cash cost delivered to Zamiin-Uud.
Phase 1 pre-production infrastructure capital is US$61.2m versus US$214.8m in the previous study; figures are not like-for-like.
Production target and forecasts include Inferred Coal Resources, approximately 12% of scheduled ROM coal.
Construction and timeline
Site establishment and early works are underway; the CHPP and rail terminal EPC contract is executed, with hiring ahead of planned Q1 2027 pre-stripping.
CHPP detailed design reached 85% review after quarter-end; subcontractor mobilised and batching plant commissioned.
Erdenet Rail Terminal design reached 30% review; its statutory trackwork and infrastructure feasibility study was approved by the transport ministry.
First coal production and export are targeted for Q4 2027, subject to construction progress, funding and approvals.
Funding and infrastructure
A US$60m Mongolian OTC bond program was registered; US$9.56m was placed in five tranches by 9 September 2026, at 11.0–13.0% coupons and 12–36-month tenors.
Sinosure-backed vendor financing is structured to defer 60% of the US$69.9m EPC contract, approximately US$42m, subject to insurance confirmation.
The Murun–Uliastai Highway is planned as a Build-Operate-Transfer PPP; the draft agreement awaits cabinet approval, with project-level entities established.
The model assumes US$126m of Mongolian OTC bonds and US$42m of deferred EPC payments; funding amounts and timing are assumptions, not assurances.
Latest events from Aspire Mining
- Loss narrowed, cash declined, and bond funding began, but going concern risk persists.AKM
H1 2026 - Reported $12.8m net loss, signed major EPC contract, and requires further funding for project build.AKM
H2 2025 - OCCP advanced to development with strong approvals, $6.7M profit, and funding focus for 2025.AKM
H2 2024 - H1 2025 loss driven by FX impacts; Ovoot project advances, but funding for full build remains needed.AKM
H1 2025 - Premium coking coal project near China, fully permitted and advancing rapidly toward production.AKM
Corporate Presentation - Ovoot offers robust economics, rapid development, and strong market positioning for premium coking coal.AKM
Investor Presentation - Half-year net profit rose to $2.74M as Ovoot Project development advanced.AKM
H1 2024 - All major Ovoot permits secured; strong cash position and robust coking coal market outlook.AKM
Q2 2024 TU - AGM advanced Ovoot Project with permits, strong economics, and 2026 production target.AKM
AGM 2025