19 Oct, 2026

Business profile and assets

  • Founded in 2017; management cited more than 200 years of combined experience and a legacy shareholder base of 40+ energy entrepreneurs.

  • Permian production capacity exceeded 10 million tons per year, with ~15 million tons per year targeted by year-end 2023; proven and probable reserves totaled 357 million tons.

  • Total resources were 1.665 billion tons; reserves and resources represented ~200 years of life at 10 million tons of annual production capacity.

  • Giant open-dune deposits were presented as offering higher process yields, favorable sand-quality testing and large, deep deposits with consistent reserve mix.

  • 2023 contract coverage represented 89% of current capacity, with a volume-weighted contract tenor of ~2 years.

Operating model and facilities

  • Facilities were designed with equipment redundancy, automated and remote operations, large dry storage and efficient loadouts to support reliability and throughput.

  • Electric dredging, water recycling above 95%, a dedicated natural-gas pipeline and multi-year fixed-price power were cited as operating advantages.

  • In-basin trucking distances were presented at ~25–150 miles, versus ~1,300+ miles for Midwestern supply; the Dune Express route targets ~0–65 miles by truck.

  • The Dune Express was projected to remove 55 million miles of sand-truck travel from public roads, reducing regional traffic, accidents and fatalities.

Dune Express and growth plans

  • The 42-mile conveyor is designed to move proppant from Kermit into the Northern Delaware Basin, with annual capacity of 13 million tons and ~85,000 tons of storage.

  • Construction was underway, with commercial service estimated to begin in Q4 2024; estimated project cost was $400 million, with net IPO proceeds of ~$300 million covering ~75%.

  • Two multi-year sand supply and logistics agreements include delivery through the Dune Express after commercial service begins; FY 2023 proppant volumes were sold out.

  • Over a 30-year period, projected reductions included ~70% in public-road miles, miles driven per well, traffic accidents, fatalities and emissions, and ~80% in drivers per well.

  • Other near-term growth initiatives included the Kermit facility expansion and development of high-capacity wellsite delivery assets.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Atlas Energy Solutions