Australian Vanadium (AVL) Investor presentation summary
Event summary combining transcript, slides, and related documents.
Investor presentation summary
28 Oct, 2026Vanadium flow battery position
VFBs have more than 8 GWh operational globally; single projects now exceed 1 GWh, with a further 44 GWh in construction or announced.
Cited advantages include minimal degradation, full depth of discharge, no thermal runaway risk, 30+ year asset design, scalable duration and recyclable, reusable electrolyte.
Operating references include Dalian at 100 MW/400 MWh, with 4 years of history, and Minami-Hayakita at 15 MW/60 MWh, with 10+ years of history.
Markets and cost levers
Target use cases include AI data centres, long-duration storage, remote electrification and hot climates; cited demand drivers include Japan's LTDA policy and Saudi Arabia's 48 GWh battery deployment plan by 2030.
A 50 MW/500 MWh VFB BESS is modelled to require ~4 kt of V₂O₅, equivalent to ~1.7% of 2024 global supply; actual demand depends on design and electrolyte specifications.
Potential cost levers include electrolyte leasing, which could shift the electrolyte component—estimated at 40–50% of VFB capex—to opex, plus V-NOMAD, BOP innovation and OEM scale-up.
Integrated Australian value chain
The strategy spans vanadium mining and processing, electrolyte manufacture and utility-scale BESS solutions, combining an Australian resource, an operational WA electrolyte facility and Lumina VFB architecture.
Lumina's 50 MW/500 MWh architecture identifies local-content roles in civils, EPCM, pumps, tanks, pipework and electrolyte; local cell-stack manufacturing is a potential opportunity.
V-NOMAD is a relocatable electrolyte production platform designed to manufacture near battery projects and reduce delivered costs; commercial deployment opportunities are being pursued in Australia and internationally.
VSUN Energy is positioning a proposed build-own-operate platform for contracted offtake, frequency control, capacity markets, arbitrage, renewable firming and ancillary services.
Latest events from Australian Vanadium
- OFS and approvals advanced as vanadium electrolyte and storage opportunities took shape.AVL
Q1 2027 TU - VFB scale-up links emerging demand with integrated supply and deployment opportunities.AVL
Investor presentation - Advanced vanadium projects and energy storage pipeline, but ongoing funding is required.AVL
H2 2026 - VFBs are expanding globally, driven by integrated platforms and surging vanadium demand.AVL
Diggers & Dealers Mining Forum 2026 - Advanced vanadium project, strong cash position, and expanded energy storage initiatives.AVL
Q4 2026 TU - Expanded high purity vanadium focus, advanced battery projects, and secured $7.5M in funding.AVL
Q3 2026 TU - Advanced integration, feasibility, and battery manufacturing, with strong cash and strategic positioning.AVL
H2 2024 - Net loss narrowed to $11.9M as key milestones were achieved, but funding needs remain urgent.AVL
H2 2025 - Advanced project feasibility, improved financials, and secured new funding for growth.AVL
H1 2026