Avanti Gold (AGC) Corporate presentation summary
Event summary combining transcript, slides, and related documents.
Corporate presentation summary
16 Mar, 2026Investment highlights and project overview
Misisi Project hosts a 3.1 Moz inferred open pit gold resource at 2.37 g/t on the Akyanga deposit, with a 55km gold belt under a 30-year mining license valid until 2045.
Extensive land package with five additional high-priority targets within 25km of Akyanga, offering significant exploration upside.
US investors are showing proactive interest in the project, reflecting strategic importance.
The project is located in the DRC's Kibara Gold Belt, with strong logistical support from Kalemie, including airport, port, and hydropower access.
The mining licenses are fully permitted, and the DRC government is supportive, offering a competitive fiscal regime.
Resource details and exploration results
NI 43-101 compliant inferred resource of 41Mt at 2.37 g/t Au, containing 3.1 Moz, remains open along strike and at depth.
Historical and recent drilling confirm high-grade, near-surface mineralization, with new intercepts such as 12.7m at 4.60 g/t Au and 15.1m at 2.31 g/t Au.
Southern extension and parallel structures like Akyanga East show strong potential, with intercepts up to 7.9m at 5.3 g/t Au.
Additional targets (Ngalula, Lubitchako, Tulonge) have returned promising trench and drill results, supporting resource expansion.
2026 exploration program and operational progress
$20m exploration program planned for 2026, with 42,000m of diamond drilling focused on resource growth and target testing.
Phase 1 prioritizes footprint expansion at Akyanga and Akyanga East; Phase 2 extends drilling to high-priority regional targets.
Drill rigs mobilized from Tanzania in February 2026; key management and technical positions filled to support operations.
Pre-mobilization site visit and community outreach completed ahead of drilling kickoff in March 2026.