Beowulf Mining (BEM) Corporate Presentation summary
Event summary combining transcript, slides, and related documents.
Corporate Presentation summary
7 Jul, 2025Strategic focus and portfolio
Developing a diversified portfolio of critical minerals, including iron ore, graphite, copper, zinc, cobalt, nickel, and gold, to support the European green transition.
Core assets include Kallak (Sweden's largest undeveloped iron ore project) and Grafintec (one of Europe's largest flake graphite resources and an anode materials plant in Finland).
Exploration assets in Kosovo and Sweden provide significant upside and optionality, targeting base and precious metals.
Positioned to benefit from EU and global political initiatives supporting supply chain security for critical raw materials.
Substantially new board and management with significant industry experience, focused on unlocking asset value.
Kallak iron ore project
Kallak North has a measured and indicated resource of 111Mt at 28% Fe and inferred resource of 25Mt at 28.3% Fe.
Scoping study outlines a 14-year open pit mine producing 2.5Mtpa of high-grade, low-impurity concentrate at 69% Fe.
Project benefits from proximity to infrastructure, low-cost clean energy, and strong demand for high-grade iron ore for green steel.
Pre-feasibility study and environmental permitting are in progress, with production targeted post-2027.
Significant exploration upside exists at Kallak South and surrounding areas, with potential for mine life extension.
Grafintec graphite and anode materials
Developing an anode materials plant in Finland, initially targeting >20,000 tonnes production in 2027, with phase 2 expansion to >60,000 tpa.
Aitolampi project holds 26.7Mt at 4.8% graphite, with high-purity concentrates suitable for battery anode production.
Project is advancing through pre-feasibility and environmental permitting, aiming for first production in 2027.
Positioned to address Europe's supply/demand imbalance for natural graphite, supporting the EU battery sector and supply chain security.
Powered by renewable energy and focused on ESG-certified supply chains.
Latest events from Beowulf Mining
- Losses narrowed and project milestones advanced, but funding risks persist.BEM
Q4 202527 Feb 2026 - Stable losses, lower costs, and urgent funding needs amid project progress and regulatory delays.BEM
Q3 202528 Nov 2025 - Advancing high-grade iron ore and graphite projects to meet Europe's green transition needs.BEM
Investor Update24 Nov 2025 - GBP 4.5m raise targets Kallak PFS, GAMP pilot, and ESG-driven growth with new institutional backing.BEM
Investor Update24 Nov 2025 - Advancing critical mineral projects in Europe to meet green transition and supply chain needs.BEM
Corporate Presentation10 Sep 2025 - Capital raise supports project progress, but higher losses and funding needs persist.BEM
Q2 202529 Aug 2025 - Advancing high-grade iron ore and graphite projects to support Europe's green transition.BEM
Corporate Presentation7 Jul 2025 - Nordic iron ore and graphite assets drive green transition and supply chain security.BEM
Corporate Presentation7 Jul 2025 - Losses narrowed as key projects advanced, but future funding remains a material uncertainty.BEM
Q3 202413 Jun 2025