Blackrock Silver (BRC) Corporate presentation summary
Event summary combining transcript, slides, and related documents.
Corporate presentation summary
24 Mar, 2026Strategic positioning and project overview
Focused on developing high-grade, low-cost primary silver and gold assets in Nevada, with Tonopah West as the flagship project.
Tonopah West is located in a historically prolific silver district, now consolidated under one of the largest land packages in the area.
Aggressive resource expansion underway, with a fully financed 17,000-metre drill program targeting open vein corridors and step-outs.
Additional exploration assets include the Silver Cloud gold project and the Tonopah North lithium project, both with significant land positions and promising drill results.
Tonopah West project economics and resources
2025 mineral resource estimate: 21.1M AgEq oz Indicated (1.33M tonnes @ 493 g/t AgEq) and 86.88M AgEq oz Inferred (5.14M tonnes @ 523 g/t AgEq).
2024 PEA base case: after-tax NPV5% of $326M, IRR of 39.2%, 8.6M AgEq oz annual production, $11.96 AISC, 2.3-year payback, and 7.8-year mine life.
Upside scenario at higher metal prices: after-tax NPV5% of $495M and IRR of 54%.
Metallurgy is straightforward with average recoveries of 96.1% gold and 88.9% silver; dore bars produced on site.
Project is on private land, adjacent to infrastructure, and environmental studies are advancing towards permitting.
Financials, share structure, and market performance
Market cap of C$825M (as of Feb 27, 2026), with 363.4M shares issued and C$25M working capital.
Share price ranged from C$0.27 to C$2.41 over the past year, with strong institutional and management ownership (55%).
Analyst coverage from major firms including Raymond James and RedCloud.