Botnia Gold (BOTX) Status Update summary
Event summary combining transcript, slides, and related documents.
Status Update summary
11 Nov, 2025Annual production and campaign results
Achieved annual processing limit of 50,000 tons, with 224.5 kg gold produced, valued at approximately 242 million SEK or $25.328 million, and an average sales price of 1,080 SEK/gram.
Campaign 6 processed 20,470 tons, including 3,000 tons of marginal ore, yielding 96.3 kg gold at a high price of 1,206 SEK/gram and $12.283 million in revenue.
Recovery rates exceeded expectations, averaging over 96% for the year, with no campaign below 95%.
Silver output estimated at 200 kg, contributing marginally to revenue.
Revenue timing is more closely linked to campaign completions than to calendar quarters.
Operational challenges and improvements
Early-year campaigns suffered from excessive waste rock dilution, especially in the first 10,000 tons of campaign 6.
New mining methods and process changes reduced dilution to 30% in later campaigns, with ore grades exceeding 6.4 g/t and peaks above 8 g/t.
Marginal ore processed this year averaged over 2 g/t, proving economically viable.
High inclusion of waste rock in ore from high-productivity areas led to lower gold grades, prompting investment in ore sorting technology.
New operational methods reduced waste rock inclusion in ore from development drives, achieving internal targets and higher gold grades.
Model reconciliation and ongoing analysis
Ongoing analysis of discrepancies between block model estimates and actual gold output, with further updates expected in Q4.
Preliminary analysis indicates higher negative deviations in total gold extracted versus the block model for the Fäbodtjärn mine.
Latest events from Botnia Gold
- Record gold output and EBIT, with ore sorting investments driving growth into 2026.BOTX
Q4 202517 Feb 2026 - Production halt, negative EBIT, and strong gold output drive financial recovery and investment.BOTX
Q3 202512 Feb 2026 - First gold sales and strong Q4 results signal a positive outlook and robust cash flow ahead.BOTX
Q4 202430 Nov 2025 - Record gold production and profitability in H1 2025, with major cost-saving investments approved.BOTX
Q2 20258 Aug 2025 - Fäbodtjärn gruva producerar guld, men Botnia visar fortsatt förlust och noll omsättning.BOTX
Q3 202413 Jun 2025 - Fäbodtjärn gold mine launched; first gold sales expected Q4 2024, cash flow positive by Q1 2025.BOTX
Q2 202413 Jun 2025 - Botnia achieved first gold revenues but posted a Q1 net loss amid production ramp-up.BOTX
Q1 20256 Jun 2025