Energy platform and value proposition

  • Modular gas turbine systems span 65 kW to multi-megawatt applications; design features include air bearings, a single moving assembly, low noise, and no oil or water use.

  • CHP recovers useful heat; systems support multiple gaseous fuels, grid-connected or island operation, and active redundancy.

  • Illustrative total cost of ownership is $0.067/kWh versus $0.094/kWh for reciprocating engines, with results subject to site-specific factors and management assumptions.

Market opportunity and positioning

  • Priority markets include data centers, ports and terminals, station power, and utility grid applications; the presentation estimates a combined $265B+ TAM.

  • Global data center opportunity is estimated at $90B+ across 28,000 MW; 100 MW is shown as an illustrative ~$320M revenue opportunity, not guidance.

  • Grid constraints from retiring baseload generation, severe weather, data center and AI demand, and clean-tech manufacturing are driving interest in on-site power.

  • The presentation positions 800 VDC infrastructure as a transition for data centers supporting 1 MW IT racks and larger, citing space, copper-demand, and conversion-efficiency constraints in legacy designs.

Product roadmap and manufacturing

  • 800 VDC Smart Power Switch testing is underway; the C600DC pilot is in qualification testing, with installation planned in an 800 VDC AI test lab.

  • 5 ppm NOx liner testing has advanced to stability tests; results indicate potential emissions below 5 ppm without abatement equipment.

  • The C250 moved from alpha to beta after a successful test run and is in performance optimization; enhanced heat-recovery prototype testing showed preliminary double-digit performance improvement.

  • Current factory footprint supports potential annual capacity of 364 MW on one shift or 728 MW on two shifts, assuming 52 productive weeks; two-shift output requires no major factory expansion.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Capstone Energy+