Corporate presentation
Logotype for Cardinal Energy Ltd

Cardinal Energy (CJ) Corporate presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Cardinal Energy Ltd

Corporate presentation summary

8 Nov, 2026

Snapshot and capital allocation

  • 176 MM shares outstanding; $2.1B market capitalization as of Nov. 5, 2026; annual dividend $0.72/share; insider ownership 22%.

  • Credit-facility debt $9 MM against a $275 MM facility; debentures $105 MM, comprising $60 MM at 7.75% and $45 MM at 8.25%; tax pools $1.2B.

  • More than $700 MM returned since inception; 2026 budget includes $105 MM conventional capital, $17 MM thermal exploration and Reford 1, $83 MM Reford 2 construction, and $20 MM ARO.

  • 2026 ARO budget was increased twice; spending is now more than 2x the required amount, with capital acceleration considered if oil prices remain supportive and leverage is below budget assumptions.

Production and operating assets

  • 2026 production guidance 25,000–25,500 boe/d, with 93% oil and liquids weighting; estimated conventional production decline is 10%.

  • More than 80% of production benefits from EOR; underlying assets are described as predictable, oil weighted and low decline, with modest annual drilling needs.

  • 2026 forecast production spans Saskatchewan conventional 3,350 boe/d, Saskatchewan thermal 6,600 boe/d, North 6,350 boe/d, Central 5,200 boe/d and South 4,000 boe/d.

  • Saskatchewan assets include the Midale miscible CO2 EOR flood; North, Central and South areas target legacy oil pools and Mannville development opportunities, including horizontal multi-lateral wells.

Thermal growth pipeline

  • Reford 1 is producing above nameplate at 6,000+ bbl/d; 2026 YTD production exceeded 6,500 bbl/d, with more than 2 MM barrels produced to date and a current steam-oil ratio of 2.6x.

  • Reford 2 nameplate expanded to 6,000 bbl/d from 4,250 bbl/d; earthworks are essentially complete, initial six well pairs are being drilled, and first steam is targeted for summer 2027.

  • Thermal pipeline includes Kelfield at 4,000–6,000+ bbl/d and Handel at an initial assessment of 8,000+ bbl/d; additional projects remain under assessment.

  • Handel Sparky discovery has 35 m of oil pay plus 7 m in the Waseca, 30–36% porosity and estimated 70–80% oil saturation; initial indications support an 8,000+ bbl/d project.

  • Three additional identified SAGD targets are estimated at 4,000–8,000 bbl/d each; combined production potential with Reford 1 is stated at more than 22,000 bbl/d, subject to exploration and technical success.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Cardinal Energy