Carnarvon Energy (CVN) AGM 2026 presentation summary
Event summary combining transcript, slides, and related documents.
AGM 2026 presentation summary
13 Nov, 2026Portfolio and financial position
Australian oil and gas portfolio spans Bedout Basin exploration, Dorado and Pavo development, and a 19.9% strategic holding in Strike Energy.
Cash was A$97m at 30 September 2026, with no debt and a US$90m carry for offshore development CAPEX; the 2027 drilling campaign was described as fully funded.
Bedout gross prospective resources rose 92% to 6.3bn boe, unrisked Pmean, from 3.3bn boe in 2023; the unrisked Pmean share was 1.02bn boe net.
Bedout permits cover ~11,000 km² in partnership with Santos; about 67% of exploration wells since modern 3D seismic arrived have found oil or gas.
Bedout exploration campaign
Two firm wells, Ara-1 and Pavo South-1, are planned from Q2 2027 using the contracted Transocean Equinox rig; estimated cost is ~A$20m for both wells.
Ara targets the Archer Formation and Cuvier Member, with potential for oil and/or gas; the presentation cites 191 MMboe gross unrisked Pmean recoverable resource.
Pavo South is a nearfield target with 74 MMboe gross unrisked Pmean recoverable volume and 64% geological chance of success; water depth is ~90m and target depth ~3,000m.
Pavo South is presented as an analogue to Pavo-1, with nearby location, similar trap style, sand-rich Archer reservoir, thicker top seal and geochemical evidence supporting charge.
Dorado and Pavo development
Dorado is FEED-ready after pre-FEED work completed in 2025; planned production capacity is ~60,000 barrels per day, or ~22m barrels of oil per year.
Dorado and Pavo hold 25m barrels of net 2C oil resources; net upfront CAPEX is estimated below ~US$200m, including US$90m of secured funding carry.
Initial operating cost is expected at US$5–10 per barrel; project life is 20 years based on discovered resources and current approvals, with Pavo planned as high-margin backfill after several years.
Latest events from Carnarvon Energy
- Bedout drilling from Q2 2027 targets 1.02bn boe net unrisked potential.CVN
Investor presentation - A$97m cash supports 2027 Bedout drilling and Dorado’s energy-security potential.CVN
Q1 2027 TU - Strategic investment in Strike, expanded Bedout resources, and strong cash position despite FY26 loss.CVN
H2 2026 - 2027 Bedout Sub-basin drilling targets major resource growth, with Dorado FEED-ready and funded.CVN
Investor presentation - A$98M cash and a 92% resource boost position the company for major 2027 Bedout drilling.CVN
Q4 2026 TU - Bedout resources up 92% to 6.2bn boe; major drilling and FEED-ready Dorado set for 2027.CVN
Status update - Dorado and exploration assets position the company to meet Australia's urgent oil supply needs.CVN
Corporate presentation - A$98 million cash, no debt, and Bedout drilling on track for H1 2027.CVN
Q3 2026 TU - Half-year loss of $1.8M, strong cash, and strategic investment in Strike Energy.CVN
H1 2026