Chesapeake Gold (CKG) Corporate presentation summary
Event summary combining transcript, slides, and related documents.
Corporate presentation summary
25 Mar, 2026Strategic positioning and asset overview
Holds one of the world's largest undeveloped gold-silver deposits, with measured and indicated resources of 17Moz gold and 423Moz silver, plus inferred resources of 2Moz gold and 59Moz silver at Metates.
Metates project re-envisioned as a low-capex, sulphide heap leach operation, reducing initial capital by 90% to $359M and extending mine life to 31 years.
Lucy Project in Sinaloa is a new oxide gold discovery, with a 700m mineralized skarn open along strike and at depth, and high-grade near-surface intercepts.
Well-funded with C$12M in treasury and over 40% insider and supportive shareholder ownership.
Project economics and financials
Metates 2021 PEA base case: $1.1B pre-tax NPV (5%), 35% IRR, 2.5-year payback at $1,600/oz gold and $22/oz silver.
Life-of-mine operating cash flow of C$3.5B, average annual gold equivalent production of 147Koz (years 1–15).
All-in sustaining cost (AISC) of $749/oz Au, with significant leverage to higher gold and silver prices.
Trades at a significant discount to peers on an EV/oz basis, offering strong re-rating potential.
Technological innovation and environmental impact
Proprietary oxidative leach technology achieves over 70% gold recovery, with testwork showing up to 74% recovery in 2024.
Technology reduces water and energy consumption, lowers GHG emissions, and eliminates tailings, supporting a "Green Gold" approach.
Accelerated oxidation kinetics: new testwork achieves 15–16% oxidation in 60 days, three times faster than previous results.
Technology is protected by patents and being tested on third-party projects for broader commercialization.
Latest events from Chesapeake Gold
- Metates and Lucy projects offer scalable, high-margin gold-silver growth with green technology.CKG
Corporate presentation25 Mar 2026 - Low-capex heap leach strategy and proprietary technology drive value at major gold-silver assets.CKG
Corporate presentation25 Mar 2026 - Low-capex heap leach strategy and proprietary technology drive value at major gold-silver assets.CKG
Corporate presentation25 Mar 2026 - Low-capex heap leach project and novel technology drive value at one of the largest gold-silver deposits.CKG
Corporate presentation25 Mar 2026 - Metates and Lucy projects drive growth, with innovative leach technology and strong value upside.CKG
Corporate presentation25 Mar 2026 - Metates advances as a low-capex, long-life heap leach project with green tech and robust economics.CKG
Corporate presentation25 Mar 2026