Clean Air Metals (AIR) Corporate presentation summary
Event summary combining transcript, slides, and related documents.
Corporate presentation summary
22 Oct, 2026Project and resource
Thunder Bay North covers 300 km² with five magmatic intrusions, near a paved highway, 230 kV transmission line and natural gas infrastructure.
Updated NI 43-101 resource published Nov. 24, 2025: 14.9 Mt indicated, 2.3 million Pt-equivalent oz; plus 2.4 Mt inferred at 1.6 g/t Pt+Pd, 0.30% Cu and 0.19% Ni.
Current Deposit: 8.9 Mt indicated at 2.7 g/t Pt+Pd, 0.32% Cu and 0.22% Ni; Escape Deposit: 6.0 Mt at 2.6 g/t Pt+Pd, 0.52% Cu and 0.28% Ni.
PEA and metallurgy
PEA results released Oct. 9, 2025; base case and Jan. 6, 2026 spot-price case: pre-tax NPV8 $219M/$718M and IRR 39%/100%; post-tax NPV8 $158M/$494M and IRR 32%/84%, all values in CAD.
PEA parameters include $89.5M CAPEX, $100.30/t OPEX and $696/oz AISC for Pt+Pd; plan targets 2,500 tpd via bulk open stoping, with a toll-milling option focused on higher-margin areas.
Metallurgical testing produced two saleable concentrates: copper concentrate grading 22.4% Cu plus 40 g/t Pt+Pd, and PGE concentrate grading over 53 g/t Pt+Pd plus over 4% Ni.
Reported recoveries: Cu 95.9%, Pd 86.3%, Pt 80.6%, Au 83.5% and Ni 57.0%.
Market drivers
Presentation cites an 800 koz/year structural platinum deficit, with 70% of primary production from South Africa and recycling at a 15-year low.
Copper demand is linked to electrification and grid expansion; refined copper shortage forecast at 330 kt in 2026, with demand projected to rise from 27 Mt to 33 Mt over the next decade.
Palladium demand drivers include tighter emissions standards and PHEVs using 15% more PGMs than ICE vehicles; PHEV growth is cited at 40% YoY with a 6% long-term CAGR forecast.