Discovery Mining (DSV) Q4 2023 earnings summary
Event summary combining transcript, slides, and related documents.
Q4 2023 earnings summary
1 Nov, 2026Executive summary
The February 2024 feasibility study positions Cordero as the world’s largest undeveloped silver project by reserves and expected annual production, with a 19-year mine life and attractive projected economics.
2023 work advanced engineering, design, drilling, and environmental and social studies; the Environmental Impact Statement was submitted in August.
The 2024 priority is to further de-risk Cordero, complete permitting, and arrange project financing; cash was C$58.9M at Dec. 31, 2023, and management cited a current balance of ~C$52M.
Financial highlights
Net loss was C$4.54M in Q4 2023 vs. C$5.67M in Q4 2022; FY 2023 net loss was C$10.41M vs. C$15.75M in 2022.
Basic and diluted loss per share was C$0.02 in Q4 2023 vs. C$0.01 in Q4 2022; FY loss per share was C$0.04 vs. C$0.12 in 2022.
At Dec. 31, 2023, total assets were C$146.1M vs. C$91.6M a year earlier; total current liabilities were C$12.2M vs. C$2.0M.
Outlook and guidance
2024 work includes FEED, additional permitting, local water-treatment plant engineering, surface-rights and infrastructure de-risking, and 2,500m of planned exploration drilling.
Targeting submission of the Change of Land Use application in Q3 2024; work also addresses land, power supply, and water permits.
The plan is to complete permitting and arrange financing for Cordero while advancing project de-risking.
Latest events from Discovery Mining
- Record output and cash flow; Cordero permits advance growth plans.DSV
Q3 2026 - Production to triple by 2031, targeting up to 1 million oz annually with record Q2 results.DSV
Mining Forum Americas 2026 - Record gold production, revenue, and liquidity in Q2 2026, with strong growth outlook.DSV
Q2 2026 - Major production growth and exploration at Porcupine and Cordero, with significant upside ahead.DSV
Very Independent Research Virtual Conference - Strong Q1 results, Kidd acquisition, and exploration success support 2026 growth outlook.DSV
Q1 2026 - Doubling gold and expanding silver output relies on new assets, studies, and imminent permits.DSV
Mining Forum Europe 2026 - Doubling gold output, ramping exploration, and Cordero silver project drive 2026 growth.DSV
Investor Day 2026 - First gold-producing quarter post-acquisition delivered strong cash flow and margins.DSV
Q2 2025 - Porcupine and Cordero deals drive major growth, strong finances, and exploration upside.DSV
Investor Update