Eco Wave Power (WAVE) Planet MicroCap Las Vegas 2026 summary
Event summary combining transcript, slides, and related documents.
Planet MicroCap Las Vegas 2026 summary
17 Jun, 2026Market opportunity and industry context
Wave energy has the potential to generate over 29,500 TWh annually, more than double current global electricity production.
Two-thirds of the world’s population lives on coastlines, making wave energy highly relevant.
AI and data centers are driving up electricity demand, with many centers located near water, making wave energy a logical fit.
Wave energy is less intermittent than other renewables and can provide 24/7 generation in suitable locations.
Regulatory support is growing, with new bills and funding initiatives in California and at the federal level in the U.S.
Technology and competitive advantages
Technology is installed on existing man-made structures, keeping expensive equipment on land for cost efficiency.
Only floaters are in the water, minimizing environmental impact and installation complexity.
No cost for land use, as breakwaters are typically provided free by ports.
System is fully modular, scalable, and can be rapidly deployed within 18-24 months.
Floaters have storm protection mode, and the technology is fully insurable.
Project pipeline and partnerships
Currently operates grid-connected projects in Israel and the U.S., with support from major partners like EDF and Shell.
First commercial sale in Taiwan and a pilot in India with Bharat Petroleum; largest project is a 20 MW concession in Portugal.
Over 404.7 MW in the project pipeline across various development stages.
Strategic partnerships with EDF, Shell, Bharat Petroleum, and I-Ke, with more AI/data center collaborations planned.
Actively discussing direct energy supply to data centers, bypassing grid and regulatory delays.
Latest events from Eco Wave Power
- Wave energy tech targets AI-driven demand with global pilots and a 400 MW project pipeline.WAVE
RedChip Future Tech Investor Conference11 Jun 2026 - Operating expenses fell 11% as global projects advanced and wave energy gained AI infrastructure focus.WAVE
Q1 202612 May 2026 - 2025 saw global project milestones, U.S. pilot success, and a net loss of $3.72M.WAVE
Q4 202519 Mar 2026 - Expenses down 1.6%, $7.48M cash, $1.02M net loss, and major projects advanced.WAVE
Q2 202422 Jan 2026 - Achieved 10% expense reduction, strong liquidity, and major global project milestones.WAVE
Q3 202412 Jan 2026 - First wave energy revenues, $3M capital raise, and global expansion drive 2024 progress.WAVE
Q4 202424 Dec 2025 - Resale of 1.83M ADSs by major shareholders, no new capital raised, with notable commercialization risks.WAVE
Registration Filing16 Dec 2025 - Operating expenses rose 18% as global expansion and project milestones advanced in H1 2025.WAVE
Q2 202523 Nov 2025 - Net loss narrowed 4.2% as cash reserves remained strong and global project milestones advanced.WAVE
Q1 202521 Nov 2025