Elixir Energy (EXR) Investor presentation summary
Event summary combining transcript, slides, and related documents.
Investor presentation summary
15 Sep, 2026Asset overview and resource position
Holds the largest acreage in the Taroom Trough, Queensland, with ~3.5 Tcf (2C) independently certified contingent gas resources and significant condensate potential.
Acreage is adjacent to key infrastructure, including the Wallumbilla Gas Hub, and is an extension of Shell's primary operational area.
Multiple stacked hydrocarbon reservoirs identified at Lorelle-3, including Canyon and Lorelle Sandstones, with up to 148m net gas-condensate pay.
Resource estimates include 3,274 Bcf (2C) gas and 30 mmbbls (2C) condensate across several permits.
Reservoirs exhibit near-conventional properties, high porosity, and permeability, supporting high flow rates.
Recent operations and well results
Lorelle-3H Phase 1 testing delivered peak rates of 10.5 mmscfde and stable rates of 2.35 mmscfde, confirming proof of concept.
Gas from the Dunk Reservoir is high quality, requiring minimal processing, with a condensate/oil to gas ratio of 10 bbls/mmscf and 47.8° API.
Lorelle Sandstone and Canyon Sandstone packages show regionally anomalous thickness and attractive petrophysical properties.
Offset wells (Daydream-2, Overston-2) have demonstrated strong unstimulated and stimulated flow rates.
Phase 2 post-soak flow testing at Lorelle-3H is scheduled to commence in October.
Infrastructure and development plans
Warkon Pilot production system planned for up to 40 mmscfd and 1,000 bbls/d, with potential for infrastructure sharing to reduce costs by up to 74%.
Conceptual midstream solution involves APA-owned and operated infrastructure, with tolling arrangements and direct pipeline access to Wallumbilla.
High-resolution 3D seismic acquisition underway, including data trades with QGC (Shell) to enhance appraisal and development planning.
Collaborative production with neighboring operators may begin within two years, accelerating regional momentum.
Latest events from Elixir Energy
- Beach commits $205m to Taroom Trough appraisal, with Diona JV upside retained.EXR
M&A announcement - Resource upgrades, narrowed loss, and strategic funding drive growth in the Taroom Trough.EXR
H2 2026 - Lorelle-3H confirms commercial gas flows and high-quality condensate, with further optimization planned.EXR
Study result - Lorelle-3H flow success and new resource bookings drive 24% growth in certified gas resources.EXR
Q4 2026 TU - Record drilling results and robust funding position set the stage for key flow tests and reserve booking.EXR
Q3 2026 TU - Major gas discovery at Daydream-2 and narrowed net loss highlight a pivotal year.EXR
H2 2024 - Cash reserves surged to $20.6M as resource growth and drilling campaigns accelerated.EXR
H1 2026 - $16.6M capital raise, 2.8 TCFe resources, and $20.6M cash position drive growth plans.EXR
Q2 2026 TU - $41.2M loss driven by Mongolian exit; focus shifts to Queensland gas development and resource growth.EXR
H2 2025