Investor presentation
Logotype for Elixir Energy Limited

Elixir Energy (EXR) Investor presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Elixir Energy Limited

Investor presentation summary

15 Sep, 2026

Asset overview and resource position

  • Holds the largest acreage in the Taroom Trough, Queensland, with ~3.5 Tcf (2C) independently certified contingent gas resources and significant condensate potential.

  • Acreage is adjacent to key infrastructure, including the Wallumbilla Gas Hub, and is an extension of Shell's primary operational area.

  • Multiple stacked hydrocarbon reservoirs identified at Lorelle-3, including Canyon and Lorelle Sandstones, with up to 148m net gas-condensate pay.

  • Resource estimates include 3,274 Bcf (2C) gas and 30 mmbbls (2C) condensate across several permits.

  • Reservoirs exhibit near-conventional properties, high porosity, and permeability, supporting high flow rates.

Recent operations and well results

  • Lorelle-3H Phase 1 testing delivered peak rates of 10.5 mmscfde and stable rates of 2.35 mmscfde, confirming proof of concept.

  • Gas from the Dunk Reservoir is high quality, requiring minimal processing, with a condensate/oil to gas ratio of 10 bbls/mmscf and 47.8° API.

  • Lorelle Sandstone and Canyon Sandstone packages show regionally anomalous thickness and attractive petrophysical properties.

  • Offset wells (Daydream-2, Overston-2) have demonstrated strong unstimulated and stimulated flow rates.

  • Phase 2 post-soak flow testing at Lorelle-3H is scheduled to commence in October.

Infrastructure and development plans

  • Warkon Pilot production system planned for up to 40 mmscfd and 1,000 bbls/d, with potential for infrastructure sharing to reduce costs by up to 74%.

  • Conceptual midstream solution involves APA-owned and operated infrastructure, with tolling arrangements and direct pipeline access to Wallumbilla.

  • High-resolution 3D seismic acquisition underway, including data trades with QGC (Shell) to enhance appraisal and development planning.

  • Collaborative production with neighboring operators may begin within two years, accelerating regional momentum.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Elixir Energy