Corporate presentation
Logotype for Endeavour Silver Corp

Endeavour Silver (EXK) Corporate presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Endeavour Silver Corp

Corporate presentation summary

2 Sep, 2026

Strategic positioning and growth outlook

  • Operates three producing mines: Guanaceví and Terronera in Mexico, and Kolpa in Peru, with a robust pipeline of exploration projects in Mexico, Peru, Chile, and the US.

  • Achieved commercial production at Terronera in October 2025, supporting significant organic growth and sector-leading silver leverage.

  • Kolpa acquisition in Peru adds 5.0 Moz AgEq to annual production, expanding geographic footprint and production scale.

  • Pitarrilla project in Mexico is one of the world’s largest undeveloped silver deposits, enhancing future growth potential.

  • Focused on maintaining steady output, advancing operational alignment, and leveraging technical strengths for further expansion.

Production and cost guidance

  • 2026 consolidated production guidance: 14.6–15.6 Moz AgEq, up ~30% from 2025, with lower cash costs.

  • 2026 cash costs projected at $12–$13/oz AgEq and AISC at $27–$28/oz AgEq, reflecting operational efficiencies.

  • Guanaceví: 3.6–3.8 Moz Ag, Kolpa: 2.3–2.5 Moz Ag, Terronera: 2.4–2.6 Moz Ag expected in 2026.

  • Capital spending for 2026 totals $91M, supporting mine development and expansion.

  • Terronera and Kolpa ramp-ups are key drivers for increased production and cost optimization.

Asset performance and operational highlights

  • Terronera processed 175,729 tonnes in Q2 2026, producing 1.3 Moz AgEq at $5.07/oz cash cost and $26.42/oz AISC.

  • Kolpa processed 233,408 tonnes in Q2 2026, producing 1.18 Moz AgEq at $22.23/oz cash cost and $29.40/oz AISC.

  • Guanaceví maintained steady production with 955,070 AgEq oz in Q2 2026, supported by high-grade drill results.

  • Kolpa’s plant expansion to 2,500 tpd largely commissioned, with ongoing exploration and resource growth.

  • Pitarrilla advancing toward feasibility study in Q3 2026, with $15M budgeted for study and $2.8M for exploration.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Endeavour Silver