Business model and portfolio

  • Greenfield development and IPP capabilities span sourcing, engineering, construction, financing, and operations, supporting project control and value capture across the lifecycle.

  • Portfolio totals 46.2 FGW, including 12.7 FGW in the mature component: 4.0 FGW operational, 5.6 FGW under construction, and 3.1 FGW pre-construction.

  • Mature portfolio is diversified across technologies, geographies, revenue structures, and project stages; 85% of the non-yielding mature component is contracted or intentionally merchant.

  • ~1.2 FGW began construction in the three months before the presentation; a further ~1.3 FGW is expected to start in 2026, with ~86% of the mature portfolio expected operational or under construction by year-end.

  • Storage portfolio reached 43.3 GWh in Q3 2026; mature storage capacity has grown 8x since 2022 and represents ~50% of mature portfolio expected revenues.

Growth and financial performance

  • Revenue and income CAGR was 41% from 2018; 2026E revenue and income guidance is $810–830m and adjusted EBITDA guidance is $575–590m.

  • Q3 2026 revenue and income rose 40% YoY to $231m and adjusted EBITDA increased 38% to $154m; adjusted EBITDA growth was 76% excluding one-time items.

  • 9M 2026 revenue and income increased 49% YoY to $641m and adjusted EBITDA rose 38% to $438m; adjusted EBITDA growth was 122% excluding Sunlight and one-time items.

  • The 8.7 FGW under-construction and pre-construction component carries $9.2bn of capex; $2.1bn was invested in 9M 2026, ~80% higher YoY.

  • Mature portfolio projects are expected to support annual recurring revenue and income above $2.2bn by year-end 2028; the mature component's expected run rate is ~$2.4bn.

U.S. expansion and execution

  • U.S. portfolio totals 31.0 FGW, with 21.3 FGW completing system impact studies and 17.9 FGW secured Safe Harbor; an additional ~5.7 FGW storage potential is excluded from the Safe Harbor total.

  • CO Bar's 1,211 MW solar and 4,000 MWh storage complex is fully under construction; its five phases have 20-year busbar PPAs with SRP and APS.

  • Solstice secured a 15-year fixed PPA with Google for 200 MWac of solar; the 250 MW and 800 MWh project targets 2029 COD and is expected to begin construction in 2028.

  • Blackwater, a 1.2 FGW PJM project, received a conditional-use county permit and secured grid connection; capacity could double through Connect and Expand.

  • A ~2 GWIT data-center pipeline spans three geographic segments, focused on large facilities near generation and leveraging co-location frameworks and capabilities across the value chain.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Enlight Renewable Energy