Status update
Logotype for Fresnillo plc

Fresnillo (FRES) Status update summary

Event summary combining transcript, slides, and related documents.

Logotype for Fresnillo plc

Status update summary

21 Oct, 2026

Q3 production

  • Attributable silver production was 10.3 moz, down 5.5% QoQ and 11.6% YoY; YTD production was 32.4 moz, down 11.5% YoY, including the end of Silverstream contributions.

  • Attributable gold production was 135.1 koz, down 12.8% QoQ and 10.7% YoY; YTD production was 425.9 koz, down 8.4% YoY.

  • Q3 by-product lead and zinc output fell 5.9% and 10.0% QoQ, respectively; YTD lead rose 8.1% and zinc rose 0.4% YoY.

  • Production was in line with expectations and full-year guidance; lower output reflected weaker grades at Juanicipio, Saucito and San Julián, plus lower throughput at Herradura and Ciénega.

2026 outlook

  • Guidance remains unchanged: attributable silver 42.0–46.5 moz, gold 500–550 koz, lead 54–59 kt and zinc 85–95 kt; silver-equivalent production is expected at 82–91 moz.

  • 2027–28 production expectations remain unchanged; a more detailed metal-by-metal update is planned with the Q4 production report.

  • Full-year targets remain on track, with Q4 priorities including operational discipline, efficiency improvements and safety.

Mine performance

  • Fresnillo mine Q3 gold output rose 74.9% YoY to 16,787 oz, supported by higher grades and improved recovery; YTD output increased 56.5%.

  • Juanicipio Q3 silver output fell 25.8% YoY to 1.8 moz as grades declined; YTD gold output rose 6.1%, supported by processing higher-grade stockpiled ore.

  • Herradura Q3 gold output fell 18.1% QoQ and 16.4% YoY, affected by lower throughput and grade; ball mill shell replacement is scheduled for Q4.

  • Ciénega Q3 gold output fell 14.7% YoY, while YTD gold rose 3.7%; increased contribution from the Victoria area is expected to support Q4 grade and ore availability.

  • Preparatory work continued to resume Noche Buena operations in 2027; Q3 recovered gold was 2,033 oz, down 58.7% YoY, and YTD output fell 38.6%.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Fresnillo