2 Jun, 2026

Project overview and strategy

  • Advancing the Dasa uranium project in Niger, the only greenfield uranium project under construction.

  • Near-term uranium production and mineral recycling are core business areas, with headquarters in Canada.

  • Also operates a zinc recycling joint venture in Türkiye, producing zinc oxide concentrate from electric arc furnace dust.

Dasa project feasibility and economics

  • 2024 feasibility study outlines 68.1 Mlb U3O8 production over 23 years at a reserve grade of 4,113 ppm, with 5,109 ppm in the first 12 years.

  • After-tax NPV8% ranges from $551M at $60/lb to $1,621M at $105/lb uranium price; after-tax IRR from 38.2% to 92.9%.

  • Mineral reserves total 73.0 Mlb U3O8, with a mine plan based on a 23-year life.

Development and operational progress

  • Infill drilling targets 51.4 Mlbs at 5,349 ppm to convert inferred resources to reserves, aiming for ~4 Mlbs/year U3O8.

  • Prefeasibility study underway for doubling mill throughput from 1,000 to 2,000 tpd.

  • Construction of the processing plant expected to take ~20 months post-financing, with commissioning and first shipments within 3 months.

  • Underground development advancing, with ramp and level access in the Flank Zone for the first 10 years of mining.