Hillgrove Resources (HGO) Noosa Mining Conference 2026 summary

Event summary combining transcript, slides, and related documents.

Logotype for Hillgrove Resources Limited

Noosa Mining Conference 2026 summary

24 Jul, 2026

Strategic location and operational advantages

  • Mine is located 55 km from Adelaide, providing easy access to power, water, highways, and port facilities.

  • All workforce is local, contributing to cost efficiency and strong community support.

  • Site is 95% rehabilitated, with all infrastructure paid off, and benefits from a nearby railway for ore transport.

  • Power costs are low at AUD 0.14 per kWh due to proximity to major power lines.

  • Institutional investor base has grown over the past six months.

Production growth and expansion plans

  • Production increased from 900,000 tonnes in 2024 to 1.6 million tonnes last year, with a 1.8 million tonne rate achieved in June.

  • Board approved the Emily Star mining front, targeting over 2 million tonnes annual production, with stope production to begin in H2 2027 and capital requirement of $20–22 million.

  • Plant has a 3.6 million tonne capacity, with plans to fill it through new mining fronts and a farm-in with Havilah.

  • Spare capacity of about 1 million tonnes presents future growth opportunities.

  • Mutooroo JV with Havilah aims to further increase throughput and reduce costs, with up to 80% interest over 24 months and a phased PFS and 5,000m drilling planned.

Exploration and resource development

  • 59,000 m of underground drilling planned this year, following 69,000 m last year.

  • Emily Star mining front to begin decline development within weeks, with production expected in the second half of 2027.

  • North Kavanagh incline being prepared for drilling in 2027, targeting production in 2028.

  • Near-mine exploration at Kanmantoo includes 13 targets within 1km of the processing facility, supporting multi-year growth.

  • Regional exploration at Kanappa and Firehawk is underway, with drilling commenced in June 2026.