Investor presentation
Logotype for Hochschild Mining plc

Hochschild Mining (HOC) Investor presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Hochschild Mining plc

Investor presentation summary

3 Nov, 2026

Portfolio and strategy

  • Precious-metals producer with 3 mines across Peru, Brazil and Argentina; 8moz Au Eq resource base and two medium-term growth projects.

  • Strategy centers on brownfield resource growth, operational efficiency, ESG performance and disciplined capital allocation across organic investment, debt repayment and shareholder returns.

  • 1.7moz Au Eq added through brownfield exploration in 2025, including 1.1moz at Royropata; on track to exceed long-term upside targets.

Operations and guidance

  • 2026 attributable production guidance: 300,000–328,000 GEO; AISC $2,157–$2,320/GEO; metal mix 73% Au and 27% Ag.

  • Inmaculada 2026 guidance: 174,000–185,000 Au Eq; drilling plan totals 17,890m, targeting 0.25moz+ of additional resources.

  • Mara Rosa guidance: 67,000–80,000oz in 2026; reorganisation is on track, production is ramping toward full capacity in H1 2026 and run rates have risen since Sep 2025.

  • San Jose 2026 attributable guidance: 59,000–63,000oz Au Eq; exploration targets NW–NS structures and resource replacement near the current mine.

Growth projects and exploration

  • Monte do Carmo is fully permitted; 2026 work includes completing engineering and updating economics, with FID expected in Q3 2026 and production targeted for 2028.

  • Royropata project EIA modification is being compiled for filing in Aug 2026; the project is expected to deliver 100,000oz+ per year from 2028.

  • Inmaculada began with one vein in 2015; 80 veins have since been discovered, with c.5.2moz Au Eq resources.

  • Pallancata/Royropata has 94 discovered veins and c.5.6moz+ Au Eq resources; 1.1moz was added there in 2025.

  • Mara Rosa near-mine drilling has added resources below the open pit; exploration evaluates a c.20km trend and aims to add 1 year+ of inferred resources.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Hochschild Mining