8 Sep, 2026Project overview and asset highlights
Black Pine Gold Project is a 100%-owned, large-scale oxide gold asset in Idaho with 4.9 Moz Indicated resource and 4.04 Moz Probable reserve, offering significant resource growth potential.
The project is a past-producing, open-pit, heap-leach operation with established infrastructure, low capital intensity, and a skilled regional workforce.
Feasibility Study (2026) outlines a 16-year mine life, producing 202 koz Au/year (Years 1-5) and 2.84 Moz Au LOM, with a $411M initial capital requirement.
Project economics show a $2.4B after-tax NPV (5%) and 60.5% IRR at $3,250/oz Au, with strong leverage to higher gold prices.
Water rights are secured, and the project design minimizes environmental and geochemical risks.
Resource and reserve growth
Probable gold reserves increased 30% to 4.04 Moz, and reserve tonnes rose 45% versus the 2024 PFS, driven by higher gold price assumptions.
Indicated resources grew 18% to 4.93 Moz, and Inferred resources increased 40% to 0.99 Moz compared to the 2024 PFS.
Ongoing 50,000-metre drill program targets conversion of Indicated to Measured resources and further resource growth.
Updated resource estimates use a $2,800/oz Au price and a 0.1 g/t Au cut-off, with sensitivity analysis showing robust ounces at higher cut-offs.
Project economics and cost profile
Initial capital is $411M, with total LOM capital of $826M and low unit operating cost of $8.98/tonne processed.
LOM average AISC is $1,566/oz, and LOM cash cost is $1,388/oz.
Project delivers a 2-year payback at $3,250/oz Au and 1.2 years at $4,500/oz Au.
LOM gold recovery averages 70.2%, with a strip ratio of 1.34:1 and average head grade of 0.29 g/t Au.
Latest events from Liberty Gold
- Feasibility study projects a 16-year mine with 4.04M oz reserve and strong economic returns.LGD
Study result - Q2 2026 delivered $43M net income, asset sales, and expanded Black Pine project activity.LGD
Q2 2026 - Black Pine advances toward production with robust economics, permitting, and strong financial backing.LGD
Precious Metals & Critical Minerals Virtual Investor Conference - Advanced Black Pine, closed major asset sales, and reported a $6.0M Q1 loss.LGD
Q1 2026 - Blackpine advances toward 2028 production, fully funded and de-risked by streamlined permitting.LGD
Precious Metals & Critical Minerals Virtual Investor Conference - Idaho gold project advances with 4.9M oz resource, strong economics, and FAST-41 permitting.LGD
Corporate presentation - Idaho gold project targets late 2028 production with low-cost heap leaching and strong support.LGD
Mining Forum Europe 2026 - Advanced Black Pine, improved liquidity, and secured major asset sales exceeding $74M.LGD
Q4 2025 - Feasibility study and permitting for Blackpine gold project advance, targeting 2026 milestones.LGD
Metals Investor Forum 2026