Investor presentation
Logotype for Many Peaks Minerals Limited

Many Peaks Minerals (MPK) Investor presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Many Peaks Minerals Limited

Investor presentation summary

13 Oct, 2026

Ferké resource and development

  • Maiden Ouarigue MRE: 26.7Mt at 1.54g/t Au for 1.323Moz, at a 0.38g/t Au cut-off; 83% Measured and Indicated.

  • Resource breakdown: 8.2Mt at 1.50g/t Measured (398koz), 14.9Mt at 1.46g/t Indicated (700koz) and 3.5Mt at 2.00g/t Inferred (225koz).

  • Open-pit PFS, underground scoping study, ESIA, metallurgical testing and geotechnical work underway; mining application planned for early 2027, with mining decision targeted for early 2028.

  • Bottle-roll tests returned 94% average recoveries, indicating potential for cyanide-leach processing.

Ferké drilling and resource growth

  • 51,000m of planned 60,000m drilling in 2026 across air-core, RC and diamond drilling completed.

  • Post-MRE intercepts include 188.9m at 3.58g/t Au from 633m, including 46.75m at 7.02g/t; and 75m at 6.11g/t from 427m, including 7m at 52.9g/t.

  • Post-MRE results increased Ferké’s vertical extent by 70%; an MRE update is expected in Q4 2026.

  • Ferké North regional drilling returned 9m at 4.33g/t Au more than 3km from Ouarigue; 14,273m in 124 RC holes completed post-MRE, with assays pending for a further 3,800m in 34 holes.

  • Ferké South drilling is pending the presidential decree; historical drilling tested only a 1.6km segment of the mineralised corridor extending more than 38km.

Other exploration projects

  • Odienné South covers more than 30km of gold anomalism along the Sassandra fault corridor; first-pass RC drilling returned 21m at 1.21g/t Au, and 11,206m of air-core drilling has assays pending.

  • Odienné follow-up RC drilling was planned to commence in late October 2026; Zone A and Zone C gold anomalism extends over 4km and 3.8km, respectively, and remains open in all directions.

  • Baga is an early-stage project covering 644km² across two granted permits; a maiden auger campaign comprised 2,700 holes and 14,800m, with assays pending.

  • Baga next steps include infill soils and follow-up trenching and auger work, targeting drill-ready prospects in 2027.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Many Peaks Minerals