PDI Gold (PDI) Investor Update summary
Event summary combining transcript, slides, and related documents.
Investor Update summary
8 Jul, 2026Project overview and highlights
Bankan Gold Project is one of Africa's largest and most advanced gold projects, with a 12.2-year mine life and average annual production of ~250,000 ounces at an all-in sustaining cost (AISC) of US$1,057/oz.
Mineral resource is 5.5Moz with a 3Moz ore reserve, and total gold production is projected at 3.03Moz from 54.5Mt at 1.86g/t Au, with 92.8% recovery.
Project NPV5% is US$1.6bn at US$2,400/oz gold price, with IRR of 46% and payback under 2 years; at US$3,300/oz, NPV5% rises to US$2.9bn and IRR to 73%.
Each US$100/oz increase in gold price adds ~US$140m to NPV.
Environmental Compliance Certificate and ESIA approved in January 2025; exploitation permit application is in its final stage.
Mining, processing, and infrastructure
Mining strategy includes three open pits (NEB, GBE, BC) and NEB underground, with early underground development to access high-grade ore.
Open pit strip ratio reduced to 1.9:1 due to steeper wall angles and smaller NEB pit; underground mining uses hybrid long hole open stoping with paste fill.
Processing plant capacity is 4.5Mtpa, using conventional CIL with gravity recovery; average gold recovery is 92.8%, with 32% recovered through gravity circuit.
Power supplied by a 32.5MW HFO plant and 30MWp solar farm; water sourced from dewatering bores and TSF.
Filtered tailings storage facility (TSF) with HDPE lining and zero-discharge design, plus comprehensive surface water and sediment control.
Financial metrics and sensitivities
Pre-production capital cost is US$463m, with sustaining capital of US$208.6m and closure costs of US$39.6m.
Project expected to generate >US$250m average annual free cash flow at US$2,400/oz, rising to >US$400m at US$3,300/oz.
Payback period is less than two years at US$2,400/oz, and just over one year at US$3,300/oz.
Project economics are robust to changes in key assumptions, with strong leverage to gold price.
All-in sustaining cost reduced by $100/oz compared to PFS, mainly due to higher feed grade and optimized mining.
Latest events from PDI Gold
- Africa's largest gold development project advances with robust economics and major exploration upside.PDI
IMARC Investor presentation - Bankan Gold Project targets ~250kozpa over 12+ years with strong economics and growth potential.PDI
Investor presentation - Merger forms a top West African gold producer with 9.5Moz resources and 400kozpa target.PDI
Investor presentation - Advancing toward 400,000oz annual gold production with strong assets, financials, and growth pipeline.PDI
Investor presentation - Advancing toward 400koz+ annual gold output with industry-leading costs and strong growth pipeline.PDI
Investor presentation - Gold output and cash flow surged, with 2026 guidance reaffirmed and key projects advancing.PDI
Q4 2026 TU - Kiniéro ramp-up and Robex merger drove record gold output, revenue, and cash flow.PDI
Q3 2026 TU - Bankan Gold Project advanced with DFS, ESIA, A$69m raise, and Robex merger; net assets up 35%.PDI
H2 2025 - Bankan Gold Project advanced with major milestones, robust funding, and strong project economics.PDI
H2 2024