Investor presentation
Logotype for Pharos Energy plc

Pharos Energy (PHAR) Investor presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Pharos Energy plc

Investor presentation summary

25 Sep, 2026

TGT fiscal terms and contractor take

  • Contractor oil take before Dec 2026 is 64% with a 35% cost recovery cap; post-Dec 2026, contractor take ranges from 36% to 84% depending on cost recovery and royalties.

  • Oil royalty rates range from 8% to 19%, with cost oil recovery caps increasing to 50% in certain scenarios.

  • Windfall tax of 50% to 60% applies to profit oil above 20% of base price; environmental fees and windfall tax are deductible from enterprise tax.

CNV fiscal terms and contractor take

  • Contractor oil take before Dec 2027 is 72% with a 35% cost recovery cap; post-Dec 2027, contractor take ranges from 43% to 84%.

  • Oil royalty rates range from 6% to 10% for production up to 75kbopd; gas royalties range from 0% to 10%.

  • Environmental fees and windfall tax are deductible from enterprise tax.

El Fayum and NBS fiscal terms

  • El Fayum pre-consolidation contractor take is 50.8%, post-consolidation is 56.8% assuming full cost oil utilisation and production ≤5kbopd.

  • NBS pre-consolidation contractor take is 45.4%, post-consolidation is 56.8% under similar assumptions.

  • Profit oil splits are based on production rates and Brent price, with deductions if Brent exceeds $80.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more