10 Sep, 2026Project overview and operational highlights
10Mtpa processing plant designed to produce approximately 100,000–106,000 oz of gold annually, based on pre-feasibility study and detailed drawings.
Located in Western Australia's Norseman-Wiluna Greenstone Belt, a prolific gold-producing region with strong infrastructure and workforce.
Project holds 100% ownership of approximately 1,000–1,100km² of underexplored tenure, with a diversified institutional register and AUD 150 million cash supporting development.
All ounces are contained in a single, low-strip, bulk mining open pit, enabling low unit operating costs and efficient processing.
Ore zones can reach up to 300 m wide per bench, reducing operational complexity and costs.
Resource update and growth potential
Mineral resource stands at 2.83Moz Au as of June 2026, with 77–86% in Measured & Indicated categories and a maiden ore reserve of 1.59Moz Au as of December 2025.
Resource expansion achieved laterally at shallow depths, adding 600,000 oz in July and increasing measured and indicated resources to 2.2 million oz.
Ongoing and planned drilling programs target resource extensions north and south, with 10,000m of RC and diamond drilling scheduled for each direction.
Additional resource zones have been discovered and converted, with high-grade intersections and new east-west structures recognized.
The project vision targets a 4–5 million oz gold system, with 2.8 million oz already in an economic scenario and high-grade shoots identified at multiple prospects.
Metallurgy, processing, and cost structure
Gold is easily liberated from quartz, requiring only crushing for heap leach processing, minimizing energy and reagent use.
Heap leach testwork demonstrates strong gold recoveries: 78% in fresh rock and 86% in oxide/transitional material at 8mm crush.
PFS uses a 73.7% recovery rate and a 160-day stacking schedule, with low reagent consumption.
All-in sustaining cost (AISC) is A$2,464/oz, and C1 cash cost is A$2,369/oz, with economies of scale from large equipment and bulk mining.
Processing infrastructure is designed for a 10Mtpa operation, with A$472M capex paid back in 2.3 years.
Latest events from Saturn Metals
- Apollo Hill's resource surged 40% to 2.83Moz, with strong funding and robust project economics.STN
H2 2026 - Major gold project targets 14-year mine life, 2.83Moz resource, and first gold in 2029.STN
Diggers & Dealers Mining Forum 2026 - Apollo Hill resource surged 26% to 2.83Moz, with strong cash and DFS progress underway.STN
Q4 2026 TU - DFS commenced and high-grade Titan Zone intercepts drive Apollo Hill growth; $50.2M cash reserves.STN
Q3 2026 TU - Large-scale, low-cost gold project with robust economics and strong growth potential.STN
Investor presentation - Mineral Resource rises 26% to 2.83Moz, with 77% now Measured and Indicated.STN
Investor update - Robust 2.24Moz gold resource, strong PFS economics, and major growth potential in Western Australia.STN
Investor presentation - Apollo Hill resource up 22% to 2.24Moz; $44.6M raised, cash at $27.2M, FY25 net loss $5.1M.STN
H2 2025 - Advanced Apollo Hill with strong PEA, improved financials, and major capital raisings.STN
H2 2024