Sino-Synergy Hydrogen Energy Technology Jiaxing (9663) H1 2026 earnings summary
Event summary combining transcript, slides, and related documents.
H1 2026 earnings summary
15 Oct, 2026Executive summary
H1 2026 revenue was RMB57.613m, down 2.2% YoY; gross profit rose 19.4% to RMB3.699m and gross margin improved to 6.4%.
Net loss narrowed to RMB148.063m from RMB184.427m; loss attributable to owners was RMB142.866m, down 22.4%.
Non-vehicle applications generated RMB39.6m, or 68.8% of revenue, with deployments expanding across rail, marine and power generation.
Priorities include commercialising R&D, integrating the hydrogen ecosystem, diversifying applications and improving operating efficiency amid weaker vehicle demand and subsidy phase-down.
Financial highlights
Revenue was RMB57.613m versus RMB58.883m YoY; cost of sales declined 3.4% to RMB53.9m.
Gross profit was RMB3.699m versus RMB3.095m; gross margin rose to 6.4% from 5.3%, supported by higher-margin non-automotive systems.
Operating loss narrowed to RMB123.736m from RMB183.063m; net loss was RMB148.063m versus RMB184.427m.
R&D expense fell to RMB46.5m from RMB67.8m; selling expenses were RMB10.2m versus RMB14.1m and administrative expenses RMB58.2m versus RMB96.7m.
Other net results swung to a RMB9.7m loss from an RMB8.8m gain, mainly on lower FVPL gains; income-tax expense rose to RMB15.1m from RMB2.4m.
Outlook and guidance
2026 priorities include commercialising technology, integrating the hydrogen ecosystem, diversifying applications and strengthening lean management; standardised C240 marine, rail and megawatt power-generation packages are targeted.
A megawatt-scale PEM electrolyser prototype and in-house testing are targeted for 2026; customised production is targeted for 2027, subject to demonstration-project progress.
Plans include outfitting one to two vessels, commissioning two to three industrial-park rail lines and replicating one to two backup-power pilots, subject to project milestones and acceptance.
Delivery of 200 Nm³/h and 250 Nm³/h PEM hydrogen-production equipment is scheduled for 2026; 5 Nm³/h equipment completed manufacturing and commissioning.
Gross-profit recovery is to be driven by increased in-house stack integration, not price cuts; new system orders are targeted to include more advance and progress payments.
Latest events from Sino-Synergy Hydrogen Energy Technology Jiaxing
- Higher gross profit and margin could not offset wider expenses and losses.9663
H2 2023 - New-product ramps cut H1 gross margin to 0.6% as revenue fell 37.3%.9663
H1 2024 - Revenue fell 36.9% as system sales weakened, while new hydrogen applications expanded.9663
H2 2024 - Revenue fell 55.7%, while gross margin improved and net loss narrowed.9663
H1 2025 - Lower revenue and heavier credit losses widened the FY2025 loss despite continued R&D and market expansion.9663
H2 2025