Executive summary

  • 2021 was a transition year, with the shift to Isaac Downs progressing and an agreement reached to acquire an 80% interest in BMC; completion was targeted for mid-CY22.

  • The combined business was positioned for annualised metallurgical coal production of 12.5Mt and 331Mt of coal reserves, on the stated 100% consolidated basis and excluding Millennium from reserves.

Financial highlights

  • FY21 underlying EBITDA was A$54.4m vs A$24.0m in CY20; operating cash flow was A$127m vs negative A$28m in CY20.

  • Profit for the period was A$10.4m vs a loss of A$8.1m; basic EPS was 3.9 cents vs negative 3.0 cents.

  • Saleable coal production was 2,070kt; FY21 FOB cash cost was A$104/t sold excluding royalties, with H2 at A$87/t vs H1 at A$114/t.

Outlook and guidance

  • FY22 priorities included reaching targeted Isaac Downs ROM capacity of 4.0Mtpa, supported by increased CHPP capacity, and ramping up Millennium and Mavis Downs toward 1Mtpa.

  • Dragline transfer to Isaac Downs, lower strip ratios than Isaac Plains East, and completion of the highway underpass and flood levee were planned to support production growth.

  • Millennium and Mavis Downs production was intended to provide baseload tonnage and cash flow ahead of a transition to underground mining in H2-2022.

  • BMC integration priorities included establishing central functions and pursuing blending, Red Mountain CHPP access, and infrastructure synergies.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Stanmore Resources