Sunshine Silver Mining & Refining (SSMR) Company presentation summary
Event summary combining transcript, slides, and related documents.
Company presentation summary
22 Jul, 2026Strategic positioning and asset overview
Operates in Idaho's Silver Valley, a top global mining jurisdiction with strong local support and infrastructure access.
Holds the highest-grade primary silver deposit in North America, with indicated resources averaging 1,022 g/t silver and inferred resources at 776 g/t.
Projected to supply up to 16–17% of U.S. silver production at full capacity, with a 24-year mine life and significant expansion potential.
Vertically integrated mine-to-refinery platform enables production of COMEX-eligible silver and reduces reliance on third-party processors.
Largest mineral rights holder in the district, with a 4x land package increase since 2010 and extensive exploration upside.
Financial highlights and economics
After-tax NPV5% of $2.2 billion at $60.27/oz silver, excluding by-product and antimony tolling upside.
Life-of-mine AISC is $18.81/oz Ag, positioning the asset competitively on the global cost curve.
Initial capital requirement estimated at ~$290 million, supported by $600 million in existing infrastructure.
IPO raised $310.5 million, with 143.7 million basic shares outstanding post-offering and no long-term debt.
Historical financials show operating losses during pre-production, with strong cash and asset positions.
Permitting, infrastructure, and operational readiness
Key water, tailings, and operating permits are in place, reducing permitting risk and supporting rapid restart.
Existing infrastructure, including shafts, refinery, and tailings storage, would cost ~$600 million to replace.
Restart plan leverages existing facilities for capital efficiency and accelerated timeline.