Logotype for Terra Metals Limited

Terra Metals (TM1) Q1 2027 TU earnings summary

Event summary combining transcript, slides, and related documents.

Logotype for Terra Metals Limited

Q1 2027 TU earnings summary

28 Oct, 2026

Executive summary

  • Dante is 100%-owned and the sole active project; Southwest PGM-Cu-Ni remained the primary focus, with a maiden Mineral Resource Estimate (MRE) targeted for Q1 CY2027.

  • Southwest mineralisation extends ~1,350 m along strike, 700 m across strike and at least 750 m down dip; the corridor remains open along strike and down dip.

  • Cash at 30 September was $57.9m, funding the MRE, Scoping Study and further development studies.

Financial highlights

  • Exploration and evaluation expenditure was $16.761m for the quarter; total exploration-related payments included $7.547m for drilling and $3.106m for sample analysis.

  • Operating cash outflow was $17.120m, including $16.761m for exploration and evaluation, $871k for administration and corporate costs, and $184k for staff costs.

  • Cash and cash equivalents declined from $75.112m at 30 June to $57.884m at 30 September; interest received was $696k.

Outlook and guidance

  • First metallurgical results are targeted for Q4 CY2026; the maiden Southwest MRE is on track for Q1 CY2027, with assays and geological modelling continuing through January-February.

  • The Scoping Study is targeted for mid-2027 after the MRE, with a Pre-Feasibility Study to follow.

  • Near-term work includes completing 2026 assays, finalising MRE geological and structural modelling, reporting metallurgy results and advancing technical studies drilling.

  • Drilling is concentrated on the MRE footprint to preserve cash for development studies; strike extensions continue in parallel at a measured pace.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Terra Metals