Investor Presentation
Logotype for Tesoro Gold Ltd

Tesoro Gold (TSO) Investor Presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Tesoro Gold Ltd

Investor Presentation summary

8 Sep, 2025

Project overview and location

  • District-scale gold system in Chile's Atacama region, covering 570km² with a 30km gold corridor.

  • El Zorro Gold Project is near major infrastructure, including highways, power, water, and airports.

  • Surrounded by operations of major global gold producers and close to population centers.

Resource and exploration highlights

  • Ternera deposit constrained MRE: 1.82Moz @ 1.10g/t Au, with 62% classified as Indicated.

  • Unconstrained MRE: 2.0Moz @ 1.07g/t Au, with ongoing infill and extensional drilling.

  • Deposit remains open in all directions, with new zones identified for further exploration.

  • Multiple high-priority regional targets to be drilled, including La Brea.

Metallurgy and processing

  • Metallurgical tests show average gold recovery of ~95% at a coarse 125μm grind size.

  • Ore is amenable to a simple, low-cost CIP process with low cyanide consumption (<0.2kg/t).

  • No deleterious elements detected; consistent performance across samples.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more