Project scale and setting

  • 100%-owned Dynasty Gold Project has a 2026 MRE of 65.55Mt at 1.85g/t Au and 12.38g/t Ag, containing 3.90Moz gold and 26.10Moz silver.

  • The epithermal system extends over 9km and remains open; 47% of the MRE is within the top 100m and 76% within the top 200m, supporting potential for a large-scale open-pit mine.

  • In Ecuador’s Andean Copper Belt, Dynasty has a small-scale mining permit and unrestricted exploration permits; Celica is 10km away and low elevation supports year-round exploration.

Resource growth and exploration

  • The March 2026 Cerro Verde update increased gold resources 41% and silver resources 34%; stated gold discovery cost was ~US$6.30/oz.

  • Cerro Verde hosts 50.82Mt at 1.66g/t Au and 9.89g/t Ag, containing 2.70Moz gold and 16.15Moz silver, or 70% of Dynasty resources.

  • A 20,000m drilling program is underway, with extension and infill drilling targeting resource growth and conversion; the next MRE is targeted for Q1 2027.

  • Drilling found shear- and vein-hosted mineralisation outside the current resource: 33.5m at 6.6g/t Au and 55.5g/t Ag from 236.7m; follow-up drilling is testing extensions.

  • Porphyry mineralisation extends from surface; post-MRE results include 184.4m at 0.8g/t Au and 3.3g/t Ag, including 11m at 7.6g/t Au and 22.5g/t Ag.

Development pathway

  • Preliminary metallurgical recoveries are 85–88% for oxide and 91% for fresh material, with further testwork targeting potential improvements.

  • Oxide resources total 12.1Mt at 1.88g/t Au and 11.2g/t Ag for 0.7Moz gold and 4.4Moz silver; the oxide base is positioned for lower-capital start-up and early cash flow.

  • Preliminary mine studies are complete; process design, capex/opex, tailings storage facility and waste-rock studies are underway, with updates planned after the 2027 MRE.

  • A scoping study is targeted for Q1 2027; the work program also maps a pre-feasibility study to CY2028, alongside environmental baseline and social impact studies.