Turaco Gold (TCG) Mining Forum Americas 2026 summary
Event summary combining transcript, slides, and related documents.
Mining Forum Americas 2026 summary
29 Sep, 2026Project growth and resource expansion
Resource base expanded from 1.5 million to 4.6 million ounces in two years, with regular updates and ongoing extensional drilling expected to further increase resources.
Maiden reserve of 2 million ounces established at a conservative gold price, with ongoing drilling indicating significant upside potential.
Woulo Woulo deposit discovered and rapidly grown to 1.7 million ounces, with further drilling targeting both open pit and underground expansion.
Additional deposits such as Anuiri, Asupiri, and Begnopan are being expanded, with high-grade zones and ongoing drilling supporting continued resource growth.
New resource estimate expected in November, feeding into the definitive feasibility study (DFS) and supporting future exploration.
Project development and economics
Pre-feasibility study (PFS) completed, with DFS targeted for April next year and final investment decision (FID) by mid-year.
Capital development cost estimated at AUD 450 million, with project NPV over AUD 2 billion and payback period of 9–12 months at current gold prices.
Fully permitted mining license in place; environmental certification expected by early 2027.
Power and infrastructure costs are low due to proximity to reliable hydroelectric power and major roads, with no need for village relocations.
Production expected to reach 220,000–250,000 ounces per year, with potential for further increases as throughput expands.
Exploration and future plans
Focus remains on resource extensions and new discoveries along the Afema Shear and within the Sefwi Belt, with multiple high-priority targets yet to be drilled.
Four rigs operating, drilling 8,000–10,000 meters per month, with ongoing infill, metallurgical, and geotechnical drilling.
New discoveries anticipated as exploration steps out from current deposits, leveraging extensive soil anomaly data.
Project area is secure, with no significant security or relocation issues, and benefits from strong infrastructure and grid connectivity.
Concrete pouring and construction expected to begin around November next year, following FID and permitting.
Latest events from Turaco Gold
- Afema Project PFS confirms strong economics; H1 2026 net loss $18.7M, DFS in progress.TCG
H1 2026 - Resource growth and project milestones set the stage for a major gold mine exceeding 200,000 oz/year.TCG
Diggers & Dealers Mining Forum 2026 - Afema Project advances with strong PFS results, robust reserves, and ongoing DFS progress.TCG
Q2 2026 TU - Afema targets 200,000 oz/year gold output, rapid resource growth, and robust project economics.TCG
Noosa Mining Conference 2026 - 2.5Moz gold resource in Côte d'Ivoire with aggressive growth and strong exploration upside.TCG
Investor Presentation - 2.52Moz gold resource, rapid growth, and aggressive 2025 exploration in Côte d'Ivoire.TCG
Investor Presentation - Afema targets 200,000oz+ annual gold output with strong economics and rapid resource growth.TCG
Investor presentation - Afema Project gold resources surged to 4.65Moz, with robust funding and PFS near completion.TCG
Q1 2026 TU - Afema gold resource increased to 4.06Moz, with robust drilling and strong cash reserves.TCG
Q4 2025 TU