Mt Todd is positioned as one of Australia's largest development-stage gold projects, with a 15 ktpd feasibility study supporting a fit-for-purpose design and expansion optionality, prioritizing grade over tonnes and significantly reducing initial capex by 59% compared to the 2024 study.
The 2025 feasibility study demonstrates strong project economics and an achievable path to near-term production, targeting the start of detailed engineering and design in 2027, which will initiate a 27-month design, construction, and commissioning process.
Strategic objectives for 2026 include permit modifications, building an Australian-based team, and completing recommended testing and evaluations.
Financial highlights and project economics
Initial capex for the 15 ktpd project is $425 million, with an after-tax NPV (5%) of $1.1 billion and IRR of 27.8% at a $2,500 gold price; at $3,300 gold, NPV rises to $2.2 billion and IRR to 44.7%.
Average annual gold production is projected at 153,000 oz for years 1-15, with a 30-year mine life and all-in sustaining costs of $1,449/oz for the same period.
Market capitalization as of March 2026 is $342.1 million, with no debt and $13.6 million in cash following a $44.85 million public offering.
Mineral resources and reserves
Proven and probable reserves total 5.2 Moz at a 0.50 g Au/t cutoff, with measured and indicated resources exceeding 9 Moz.
Average ore grade is 1.04 g Au/t for years 1-15 and 0.97 g Au/t life of mine, with a life-of-mine gold recovery rate of 88.5%.
Latest events from Vista Gold
- Q2 2026 net loss $3.0M; cash $49.54M after $44.85M equity raise; no debt.VGZ
Q2 202630 Jul 2026 - Mt. Todd targets 2027 engineering start, with strong economics and major growth potential.VGZ
Mining Forum Europe 20268 Jul 2026 - Mount Todd's new feasibility study targets lower capex, higher grades, and strong strategic interest.VGZ
Emerging Growth Virtual Conference8 Jul 2026 - Advancing a fully permitted gold project with new drilling, lower CapEx, and flexible transaction options.VGZ
Emerging Growth Conference778 Jul 2026 - Conference featured major updates in mining, fintech, biotech, and defense, with strong focus on innovation.VGZ
Emerging Growth Conference 9310 Jun 2026 - Feasibility study, strong treasury, and equity raise position Mt Todd for 2027 gold production.VGZ
Q4 20254 May 2026 - Q1 financing strengthened cash, enabling Mt Todd progress and 2027 engineering start.VGZ
Q1 20261 May 2026 - Late 2029 production targeted, with strong economics and major exploration upside.VGZ