Logotype for Wallbridge Mining Company Limited

Wallbridge Mining Company (WM) Corporate presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Wallbridge Mining Company Limited

Corporate presentation summary

8 May, 2026

Strategic positioning and asset overview

  • Holds a district-scale land package in Quebec's Abitibi region, with significant gold resources at Fenelon and Martiniere projects.

  • Fenelon and Martiniere combined host 2.1 Moz indicated and 2.0 Moz inferred gold resources as of 2025.

  • Martiniere redefined as a larger gold system, with mineralization open along strike, at depth, and to the north.

  • Ongoing and planned drilling campaigns aim to expand resource scale and continuity.

  • Operates in a top-tier mining jurisdiction with established infrastructure and workforce.

Fenelon Gold Project: PEA and economics

  • 2025 PEA outlines a 16-year mine life with average annual production of 107,000 oz (127,000 oz in first five years).

  • After-tax NPV (5%) of $706M and IRR of 21% at US$2,200/oz gold price; initial capex $579M.

  • Total cash costs of $851/oz and all-in sustaining costs (AISC) of $1,046/oz.

  • Strong free cash flow generation, averaging $120M annually after tax.

  • Sensitivity analysis shows robust economics across a range of gold prices and cost scenarios.

Martiniere Gold Project: Growth and exploration

  • 2025 drilling (17,411m) expanded mineralized footprint to 2 km x 800m x 800m.

  • 2026 program includes a two-phase, 17,000m campaign targeting scale and higher-grade structures.

  • Objective to define system scale and test for 2+ Moz gold resource potential.

  • Results-driven approach with flexibility to follow strongest growth vectors.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more