)
Astronics (ATRO) investor relations material
Astronics Conference presentation summary
Complete event summary combining all related documents: earnings call transcript, report, and slide presentation.Business and growth drivers
TTM Q3 2026 sales were $1,002.3 million, with 91% from Aerospace and 9% from Test Systems.
2026 revenue guidance was $1.02B–$1.04B; drivers include higher aircraft production, passenger connectivity and premium-seat upgrades.
IFEC in-seat power serves 2+ million seats on 290+ airlines, with estimated market share above 90%.
Seat-motion products have approximately 30% market share; commercial first- and business-class content is approximately $9,000–$10,000 per seat.
Aerospace and defense opportunities
MV-75 electrical-power development is a roughly $100 million effort through mid-2027; expected shipset content is approximately $1 million.
U.S. Army Radio Test Set 4549/T has a $215 million contract; $145 million remained after the first $44.7 million production order.
2026 Test revenue was expected at $85–$90 million, including approximately $14–$15 million from the 4549/T program.
Financial performance
Q3 2026 sales were $271.7 million; bookings were $290.4 million and backlog was $780.0 million, versus $646.7 million in Q3 2025.
Q3 GAAP operating income reached a record $54.0 million; adjusted operating income was $51.0 million and adjusted margin was 18.8%.
Gross margin rose 410 bps YoY to 34.6%; drivers included higher volume, improved productivity and $1.9 million in tariff refunds.
Q3 net income was $52.2 million and diluted EPS was $1.08; adjusted diluted EPS was $0.81 and adjusted EBITDA was $59.3 million, or 21.8% of sales.
- Record Q3 results and $780M backlog support strong 2027 growth expectations.ATRO
Q3 2026 - Record earnings and a $40.198M backlog supported a strong 2000 shipment outlook.ATRO
Q4 1999 - Record growth led by F-16 demand; 2001 sales target exceeded $85M.ATRO
Q4 2000 - Record 2001 results met weakening demand as F-16 production neared its end.ATRO
Q4 2001 - F-16 sales faded, but stable margins and the JSF award shaped the next growth phase.ATRO
Q4 2002 - F-16 completion pressured 2003 results, while new design wins built a growth pipeline.ATRO
Q4 2003 - Higher development spending drove a 2004 loss as backlog and AES set up 2005 growth.ATRO
Q4 2004 - FY05 sales surged 117%; $95.1M backlog supports growth, tempered by certification risks.ATRO
Q4 2005 - Sales grew, but Eclipse charges cut FY08 earnings as DME reshaped the FY09 outlook.ATRO
Q4 2008
)
)
)
)
)
)
)
)