224Mt sulphide Mineral Resource at 0.49% Cu and 0.36g/t Au; 100Mt Ore Reserve at 0.47% Cu and 0.44g/t Au.
Located in north-eastern South Australia, ~90km WNW of Broken Hill; established road, rail and energy infrastructure nearby.
Exclusive right to acquire an 80% interest; Havilah retains 20%, free-carried to FID, with a right of first refusal over its interest.
Havilah contributes ~30 years of local geology and land knowledge; development alternatives include annual throughput of 10–20Mt.
Development and drilling
PFS underway, targeted for completion in H2 FY28; drilling completion expected in H1 FY28, with timing of a feasibility study dependent on PFS outcomes.
Six rigs operating: four diamond and two RC; ~130km infill and extension program supports resource, reserve and technical studies.
Drilled 8.7km in Q1 FY27 and a further 6.5km in October; US$51M expected to be capitalised in FY27.
PFS work covers resource modelling, mine design and scheduling, metallurgy, geotechnical and hydrogeology, infrastructure, tailings, approvals and export logistics.
PEPR and EPBC approvals identified as critical path to FID; baseline environmental studies require a minimum two years.
Investment case and infrastructure
Staged entry offers a low-cost growth option: A$105M upfront for the exclusive acquisition right, with a further A$105M consideration to acquire the 80% interest.
Flat terrain, existing access roads, a proposed rail siding ~75km from site and a potential ~100km, 220kV grid connection support lower capital intensity; subject to approvals and consents.
Local groundwater supply and regional hydrogeology are being assessed; the ephemeral creek crossing the project area may require diversion.
Native Title Mining Agreement includes employment, training and business development opportunities; heritage monitors have supported site establishment, drilling and surveys.
- Record FY26 output and cash generation underpin growth, decarbonisation and reserve expansion.SFR
AGM 2026 presentation - 38.9kt CuEq on guidance run-rate; $272M EBITDA and $342M net cash.SFR
Q1 2027 - Record profit, strong cash, and a 35c dividend set the stage for higher FY27 investment.SFR
H2 2026 - Q4 FY26 copper equivalent output jumped 38%, fueling record revenue and net cash of $353M.SFR
Q4 2026 - Record sales and EBITDA achieved, with strong cash flow despite production and supply risks.SFR
Q3 2026 - Sustainability, safety, and cultural heritage are central, with strong governance and ambitious targets.SFR
Status update - H1 FY26 copper equivalent production hit 72.1kt, net cash rose to $13M, and guidance is maintained.SFR
Q2 2026 - FY24 CuEq output rose 47% to 133.5kt; FY25 guidance targets 13% growth.SFR
Q4 2024 - Profit rebounded to $49.7M and EBITDA surged 87% as net debt fell to $288.2M.SFR