Investor presentation
Logotype for BHP Group Ltd

BHP Group (BHP) Investor presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for BHP Group Ltd

Investor presentation summary

22 Nov, 2026

Copper market and strategic position

  • Copper demand growth and declining output from existing mines are expected to require up to 10 Mtpa of new primary supply by the late next decade.

  • Copper production is targeted to rise to ~2 Mtpa by 2035 across the portfolio; Copper SA is expected to contribute ~one-third of that growth.

  • Copper SA is a wholly owned polymetallic resource with an estimated ~80-year mine life and the world’s second-largest contained copper resource.

  • Integrated operations include three sites, an onsite smelter and refinery, and copper, gold, silver and uranium products.

Operating performance and asset base

  • FY26 delivered record Copper SA production, including record material mined and ore milled, Olympic Dam 20-year production, concentrate production, gold production and concentrate smelted.

  • FY26 unit cost was US$0.32/lb including by-product credits; by-product revenue was US$2.3bn.

  • Record FY26 EBITDA was US$3.2bn and free cash flow was ~US$1.0bn.

  • Carrapateena and Prominent Hill integration synergies reached 2.5x the original estimate, with >US$130m annual EBITDA synergies.

  • The local workforce comprises ~8,000 employees and contractors; FY26 safety performance included zero high-potential injuries.

Growth strategy and projects

  • Production ambition is ~500 ktpa copper and ~800 ktpa CuEq by 2035, rising to up to 650 ktpa copper and ~1 Mtpa CuEq by 2040.

  • Phase 1 integrates Prominent Hill Expansion, Carrapateena Expansion, Olympic Dam Mine & Concentrator Growth and smelter/refinery expansion.

  • Carrapateena’s block cave targets first drawbell in early FY30 and first production in FY30; Olympic Dam’s mine and concentrator project targets first production in FY34.

  • A two-stage smelter is designed to enable larger-scale mining, improve resource use and operating flexibility, and support sales of both cathode and concentrate.

  • By-product CuEq production is targeted to increase 50% to 300 ktpa by 2035, including gold production growth of 45% and uranium growth of 65%.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from BHP Group