)
BHP Group (BHP) investor relations material
BHP Group Investor presentation summary
Complete event summary combining all related documents: earnings call transcript, report, and slide presentation.Copper market and strategic position
Copper demand growth and declining output from existing mines are expected to require up to 10 Mtpa of new primary supply by the late next decade.
Copper production is targeted to rise to ~2 Mtpa by 2035 across the portfolio; Copper SA is expected to contribute ~one-third of that growth.
Copper SA is a wholly owned polymetallic resource with an estimated ~80-year mine life and the world’s second-largest contained copper resource.
Integrated operations include three sites, an onsite smelter and refinery, and copper, gold, silver and uranium products.
Operating performance and asset base
FY26 delivered record Copper SA production, including record material mined and ore milled, Olympic Dam 20-year production, concentrate production, gold production and concentrate smelted.
FY26 unit cost was US$0.32/lb including by-product credits; by-product revenue was US$2.3bn.
Record FY26 EBITDA was US$3.2bn and free cash flow was ~US$1.0bn.
Carrapateena and Prominent Hill integration synergies reached 2.5x the original estimate, with >US$130m annual EBITDA synergies.
The local workforce comprises ~8,000 employees and contractors; FY26 safety performance included zero high-potential injuries.
Growth strategy and projects
Production ambition is ~500 ktpa copper and ~800 ktpa CuEq by 2035, rising to up to 650 ktpa copper and ~1 Mtpa CuEq by 2040.
Phase 1 integrates Prominent Hill Expansion, Carrapateena Expansion, Olympic Dam Mine & Concentrator Growth and smelter/refinery expansion.
Carrapateena’s block cave targets first drawbell in early FY30 and first production in FY30; Olympic Dam’s mine and concentrator project targets first production in FY34.
A two-stage smelter is designed to enable larger-scale mining, improve resource use and operating flexibility, and support sales of both cathode and concentrate.
By-product CuEq production is targeted to increase 50% to 300 ktpa by 2035, including gold production growth of 45% and uranium growth of 65%.
- Strong FY26 results and dividends met scrutiny over safety, Jansen costs and climate plans.BHP
AGM 2026 - Guidance held steady as bulk strength and higher prices offset weaker copper output.BHP
Q1 2027 TU - Record copper and iron ore earnings, strong cash flow, and sector-leading margins drive robust returns.BHP
H2 2026 - Record iron ore and copper output, robust cost control, and major growth projects advanced.BHP
Q4 2026 TU - Strong results, portfolio growth in copper and potash, and a $5.6B dividend were key AGM highlights.BHP
AGM 2025 - Strong financials, climate action, and governance dominated the AGM, with robust shareholder engagement.BHP
AGM 2024 - Disciplined growth and operational excellence drive strong returns and resilient cash flow.BHP
Bank of America Global Metals, Mining and Steel Conference 2026 - Copper and iron ore drive robust performance, with improved cost guidance and CEO transition ahead.BHP
Q3 2026 TU - Copper growth and cost discipline offset weaker prices amid major investments and the Samarco settlement.BHP
H1 2025
)
)
)
)
)
)
)
)