Project status and development

  • Mine restart project is 95% complete, targeting first production in H1 2026, with phased commissioning underway and expanded land package to 6,283.7 acres.

  • Processing plant is over 93% complete, with a new 1,800 tpd facility designed for future expansion to 2,500 tpd.

  • Tailings filter plant is on the critical path, with main development activities scheduled through H1 2026.

  • Bunker 2.0 expansion aims for 2,500 tpd throughput, supported by a $150M US EXIM Bank LOI.

Operational advantages and cost structure

  • Located in a premier US mining jurisdiction with 100% private land and 406 patented claims.

  • Portal access to shallow mineralization enables low-cost mechanized underground mining.

  • Positioned on the lower half of the zinc cost curve, benefiting from low-cost power ($0.06/kWh) and existing infrastructure.

  • Clean zinc and lead/silver concentrates are trucked to Teck's Trail Smelter with no penalties.

Resource base and expansion potential

  • Measured & Indicated resources: 7.0 Mt @ 1.00 opt Ag, 2.40% Pb, 5.44% Zn; Inferred: 6.9 Mt @ 1.52 opt Ag, 2.87% Pb, 4.96% Zn.

  • Probable reserves: 3.2 Mt @ 1.12 opt Ag, 2.59% Pb, 5.81% Zn.

  • Expansion plan targets a return to a 50/50 silver-base metals revenue mix and increased free cash flow by mining higher-grade silver-lead and silver-copper zones.

  • Significant increase in post-tax free cash flow projected as more silver is produced in later years.