4 Jun, 2026Project status and development
Mine restart project is 95% complete, targeting first production in H1 2026, with phased commissioning underway and expanded land package to 6,283.7 acres.
Processing plant is over 93% complete, with a new 1,800 tpd facility designed for future expansion to 2,500 tpd.
Tailings filter plant is on the critical path, with main development activities scheduled through H1 2026.
Bunker 2.0 expansion aims for 2,500 tpd throughput, supported by a $150M US EXIM Bank LOI.
Operational advantages and cost structure
Located in a premier US mining jurisdiction with 100% private land and 406 patented claims.
Portal access to shallow mineralization enables low-cost mechanized underground mining.
Positioned on the lower half of the zinc cost curve, benefiting from low-cost power ($0.06/kWh) and existing infrastructure.
Clean zinc and lead/silver concentrates are trucked to Teck's Trail Smelter with no penalties.
Resource base and expansion potential
Measured & Indicated resources: 7.0 Mt @ 1.00 opt Ag, 2.40% Pb, 5.44% Zn; Inferred: 6.9 Mt @ 1.52 opt Ag, 2.87% Pb, 4.96% Zn.
Probable reserves: 3.2 Mt @ 1.12 opt Ag, 2.59% Pb, 5.81% Zn.
Expansion plan targets a return to a 50/50 silver-base metals revenue mix and increased free cash flow by mining higher-grade silver-lead and silver-copper zones.
Significant increase in post-tax free cash flow projected as more silver is produced in later years.
Latest events from Bunker Hill Mining
- Proxy covers director elections, compensation plan changes, and major 2025 restructuring.BNKR
Proxy filing13 May 2026 - On track for 2026 production, major expansion, and strong exploration-driven growth.BNKR
Corporate presentation8 May 2026 - Q1 2026 net income surged to $20.1M on warrant revaluation gains, with no revenue reported.BNKR
Q1 20267 May 2026 - On track for 2026 production, major expansion, and strong growth potential in a top mining district.BNKR
Corporate presentation1 May 2026 - C$0.15/unit private placement raises $26M+ for mine restart, with Teck and Sprott as lead investors.BNKR
Registration Filing18 Mar 2026 - Major restructuring, $61.8M raised, and mine restart targeted for H1 2026 amid $93.1M net loss.BNKR
Q4 202518 Mar 2026 - Net loss widened to $25.3M in 2024; mine restart delayed to 2026 pending major new financing.BNKR
Q4 202418 Mar 2026 - Major mine restart planned for 2026 after significant 2025 recapitalization and equity raises.BNKR
Registration Filing18 Mar 2026 - Proxy covers director elections, compensation, equity plans, and major 2024 milestones.BNKR
Proxy Filing18 Mar 2026