Q4 2019 earnings summary
12 Nov, 2026Executive summary
2019 revenue rose 11% to $75.8m, while attributable profit reached $42.0m; results included a $29.7m foreign-exchange gain from RTGS currency devaluation.
Operational challenges in H1—grade dilution, safety and unreliable electricity—were addressed through retraining, mining-method changes and power-supply measures.
Financial highlights
Revenue was $75.826m, up 11% YoY; EBITDA was $29.935m, up 54%, and operating profit was $60.889m, up 179%.
Profit after tax was $50.401m, up 260%; attributable profit was $42.018m, up 296%; EPS was 382 cents, up 286%.
Higher realised gold price of $1,382/oz versus $1,245/oz in 2018 was the main revenue driver; improved grade and recovery added $1.4m, partly offset by $0.6m from lower tonnes.
Operating cash flow was $18.060m; year-end cash was $9.383m. Working-capital absorption reflected reduced supplier credit and higher stocks and prepayments.
Outlook and guidance
Target production is 80,000 oz/year from 2022, supported by higher throughput, deeper-level ore and Central Shaft hoisting capacity.
Central Shaft was expected to commission in 2020 and replace the existing production shaft by 2021; capital spending was expected to decline after project completion in 2020.
Medium-term goals include AISC of $700–$800/oz and production growth to 80,000–100,000 oz/year over 2–4 years.
Deeper exploration is intended to extend mine life beyond 2034; longer-term plans include evaluating Zimbabwe growth opportunities and deploying surplus cash flow.
Latest events from Caledonia Mining
- Blanket constraints cut Q3 output as higher gold prices and Bilboes progress supported growth plans.CMCL
Q3 2026 - Record Q3 gold output supported growth as Bilboes acquisition plans advanced.CMCL
Q3 2022 - Lower grades and gold prices pressured FY2014 revenue; shaft investment underpins growth from 2016.CMCL
Q4 2014 - Higher throughput lifted production; lower gold prices cut revenue, while 2016 output is targeted at 50,000 oz.CMCL
Q4 2015 - Central Shaft targets 80,000 oz annual capacity by 2021 after a challenging 2018.CMCL
Q4 2018 - Record output and cash generation support a ramp to 80,000 oz in 2022.CMCL
Q4 2020 - Record output and strong cash flow fund growth toward 80,000 oz by 2021.CMCL
Q4 2016 - Bilboes project drives ambitious production growth, backed by strong economics and funding.CMCL
Mining Forum Americas 2026 - Record FY profit and cash flow as higher gold prices support stable Blanket output.CMCL
Q4 2024