Investor presentation
Logotype for Catalyst Metals Limited

Catalyst Metals (CYL) Investor presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Catalyst Metals Limited

Investor presentation summary

20 May, 2026

Strategic growth and production targets

  • Focus on two large gold belts supporting long-term organic growth and aiming for ±200koz annual production and ±2Moz Reserve targets by FY26F, with current production at 100-110koz pa and AISC of A$2,750–A$2,950/oz.

  • Group Reserves stand at 1.5Moz @ 2.6g/t and Resources at 4.2Moz @ 3.2g/t, with high-grade and low-grade breakdowns provided.

  • Three-year strategy includes increasing production, lowering costs to ~A$2,000/oz, and filling underutilized processing capacity.

Infrastructure and processing capacity

  • Existing infrastructure includes a central processing plant (1.4Mt/2Mtpa), expanded camp, haul roads, and airstrip, enabling faster, lower-cost development.

  • Study underway to expand processing capacity from 2Mtpa to 2.5–3.0Mtpa by refurbishing a second circuit, with capital cost estimated at A$50–75m.

  • Two scenarios for mill expansion: two standalone circuits or parallel milling/leaching using upgraded crushing circuit.

Resource growth and exploration pipeline

  • Resource drill-outs and exploration focus on increasing Reserves, with a 10-year plan underpinned by current Reserves and pipeline projects like Hermes, Triple P, and Parrot/Rosella.

  • Key deposits targeted for growth include Cinnamon, Old Highway, Plutonic Main, Trident, Plutonic East, and K2, with significant drilling results and resource expansion potential.

  • Greenfield exploration and consolidation of a 190km near-contiguous land package aim to unlock underexplored regions.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more