Contango Ore (CTGO) Status update summary
Event summary combining transcript, slides, and related documents.
Status update summary
10 Mar, 2026Exploration and drilling updates
Discovery of the KM Vein, a new high-grade gold vein at right angles to the main Lucky Shot shear system, confirmed by multiple drill intercepts with grades up to 60.22 g/t over 5.92m and subintervals up to 294.77 g/t.
The KM Vein and other veins (L1B, L1C, L2) show strong mineralization and structural complexity, with visible gold observed across multiple veins, indicating a robust, multi-vein, stacked gold-bearing system.
Drilling is about 12% complete for the 18,000 m program, with 20 holes totaling 2,063 meters finished and 40 more planned through April 2026, focusing on expanding resource definition and understanding vein continuity.
Drilling targets the historically mined L2 vein, underlying L1b and L1c veins, and new structures like the KM vein.
Underground drilling from established infrastructure increases efficiency, control, and data quality, allowing rapid turnaround and real-time model updates.
Key assay results and geological findings
Multiple high-grade gold intersections were reported, including 99.75 g/t Au over 0.31m (KM vein) and 82.33 g/t Au over 0.5m (L1c vein).
The KM vein, a newly identified structure, shows significant gold mineralization and adds exploration potential.
The L2 vein remains the primary focus, with L1b and L1c veins also showing promising results.
Technical and operational advancements
PhotonAssay technology adopted for gold assays, enabling non-destructive, large-sample, and more representative results, especially important for coarse gold.
Analytical testing uses PhotonAssay and ICP-MS methods for gold and multi-element analysis.
Systematic digital logging and near real-time data integration enhance exploration efficiency and decision-making.
Quality assurance includes systematic logging, insertion of certified reference materials, blanks, and duplicates every 10 samples.
All procedures comply with industry best practices and SEC S-K 1300 requirements.
Latest events from Contango Ore
- Production to triple and silver resources surge after merger, targeting mid-tier status.CTGO
Sidoti March Small-Cap Virtual Conference19 Mar 2026 - Strong FY 2025 results, rising production outlook, and major merger set for March 2026.CTGO
Q4 202516 Mar 2026 - Proxy advisors endorse the merger, giving stockholders 50% of the new company.CTGO
Proxy Filing11 Mar 2026 - Shareholders to vote on a merger creating a 50/50 owned precious metals company, with strong board support.CTGO
Proxy Filing13 Feb 2026 - Raised $50M to unwind hedges, reduce debt, and drive growth post-merger with Dolly Varden.CTGO
Status update12 Feb 2026 - Tripling gold output to 200,000 ounces in five years, fully funded by internal cash flow.CTGO
Nordic Funds & Mines Conference 20253 Feb 2026 - Gold output and sales beat targets; Johnson Tract and exploration progress as planned.CTGO
Investor Update23 Jan 2026 - First gold pour at Manh Choh and strong JV cash flow mark a milestone quarter.CTGO
Q3 202413 Jan 2026 - 2025 gold output forecast at 60,000 oz, AISC $1,625/oz, $50M cash, mine life extended.CTGO
Investor Update12 Jan 2026