MMG (1208) Q2 2024 earnings summary
Event summary combining transcript, slides, and related documents.
Q2 2024 earnings summary
3 Feb, 2026Executive summary
Achieved a significant reduction in total recordable injury frequency (TRIF) to 2.28 per million hours, with June at a year-low of 1.72, though significant energy exchange events increased to 1.38 per million hours.
Total copper production (cathode and concentrate) was 90,972 tonnes, down 2% year-over-year but up 36% sequentially, with Las Bambas and Kinsevere showing sequential growth and Khoemacau contributing its first full quarter.
Zinc production reached 50,300 tonnes, up 1% year-over-year, with Rosebery achieving its second highest quarterly ore mined and milled volumes in 20 years.
Completed a $1.2 billion rights issue, oversubscribed 2.8x, to fund the Khoemacau acquisition and reduce gearing from 60% to 44%.
Key community agreements were reached at Las Bambas, and Kinsevere's expansion project remains on track, with first cobalt sales in June.
Financial highlights
Rights issue proceeds will repay debt and support future growth, with net debt expected to fall to $4.7 billion and annual interest cost reduced by $80 million.
Copper prices averaged $9,753/t in Q2 2024, up 15.6% from Q1, while zinc averaged $2,833/t, also up 15.6% quarter-on-quarter.
MMG entered into hedges for 120 KT copper, exceeding current output, and for zinc, to secure cash flow and support expansion projects.
Gold and silver prices surged by 12.9% and 23.6% respectively, quarter-on-quarter, driven by geopolitical concerns and a dovish Fed stance.
MMG's interest in Khoemacau reduced to 55% following joint venture formation, with up to $611.1 million committed.
Outlook and guidance
Las Bambas copper production for 2024 expected at the higher end of 280,000–320,000 tonnes, with improved C1 cost guidance of $1.55–$1.75/lb.
Las Bambas 2025 copper output targeted at 350,000–400,000 tonnes, with Chalcobamba contributing higher-grade ore.
Kinsevere 2024 copper cathode guidance at 39,000–44,000 tonnes, C1 cost revised up to $3–$3.35/lb; ramp-up to 80,000 tonnes copper and 4,000–6,000 tonnes cobalt by 2025.
Khoemacau 2024 copper production guidance at 30,500–40,500 tonnes, C1 cost $2.30–$2.65/lb; full ramp-up to 60,000 tonnes by 2026 and 130,000 tonnes by 2028.
Dugald River zinc production for 2024 expected at lower end of 175,000–190,000 tonnes, C1 cost $0.70–$0.85/lb.
Rosebery zinc production for 2024 guided at 50,000–60,000 tonnes, C1 cost $0.05–$0.20/lb.
Latest events from MMG
- Stable production and lower costs position all mines to meet guidance, with $1.6B raised for growth.1208
Q2 202623 Jul 2026 - Copper and precious metals output rose, lowering costs and supporting 2026 guidance.1208
Q1 202623 Jul 2026 - Record copper and zinc output, strong by-product credits, and major expansion set the stage for 2026.1208
Q4 202521 Jul 2026 - Q2 2025 saw record copper output, improved costs, and major dividend and expansion milestones.1208
Q2 202521 Jul 2026 - MMG acquires Anglo American's Brazilian nickel assets for up to US$500M, boosting global presence.1208
M&A Announcement9 Jul 2026 - Net profit up 200% to $366M, EBITDA up 40%, with major growth and balance sheet strengthening.1208
H2 20248 Jul 2026 - Record revenue and profit growth in 2025, with robust operations and major expansion projects.1208
H2 20258 Jul 2026 - Copper output jumped 76% year-over-year, offsetting zinc declines and supporting a strong outlook.1208
Q1 20253 Feb 2026 - Driving growth in critical minerals with strong ESG and community focus for a low-carbon future.1208
Status Update2 Feb 2026