Logotype for Rio2 Limited

Rio2 (RIO) Q2 2026 earnings summary

Event summary combining transcript, slides, and related documents.

Logotype for Rio2 Limited

Q2 2026 earnings summary

17 Aug, 2026

Executive summary

  • Q2 2026 results showed operational improvements at both Condestable and Fenix Gold, with consolidated production of 13,539 oz gold, 75,437 oz silver, and 9.3M lbs copper.

  • Condestable delivered steady cash flows and operational performance, while Fenix Gold ramp-up advanced with expanded work areas, increased workforce, and new mining fleet.

  • Fenix Gold faced significant weather disruptions, including two major snowstorms, impacting production and delaying steady-state throughput.

  • Condestable integration is progressing, with ongoing plant expansion and ore sorting evaluations; EIA modification approval expected in Q3.

  • Commercial production at Fenix Gold is targeted for Q4 2026.

Segment performance

  • Condestable has been under management for five months, operating at steady state, producing 9.3M lbs copper, 4,451 oz gold, and 74,374 oz silver in Q2.

  • Fenix Gold produced 9,088 oz gold in Q2, with ramp-up affected by weather and lower grades; cash cost $2,701/oz, AISC $2,873/oz.

  • Mining fleet issues at Fenix Gold were resolved with new trucks and excavators, and operator availability improved.

  • Leach pad operations at Fenix Gold adapted to winter conditions using plastic covers, improving temperature control and water retention.

  • Exploration and ore sorting trials are underway at Condestable, with a pilot plant arriving in Q4.

Financial highlights

  • Q2 2026 EBITDA was $76.2M; adjusted EBITDA $46.5M; consolidated revenue $105.3M; net income $46.8M; cash and equivalents $49.7M at June 30, 2026.

  • Income from mine operations was $39.2M; adjusted net income $17.1M, up from a $0.9M loss in Q2 2025.

  • Cash provided by operating activities was $0.3M; investing activities used $12.4M; financing activities used $31.0M.

  • At Condestable, Q2 AISC was $3.10/lb copper, with cash cost $2.34/lb; at Fenix Gold, Q2 AISC was $2,873/oz gold.

  • Fenix Gold Q2 saw 19,325 contained ounces stacked and a 47% recovery rate; feasibility assumes 70-75% recovery.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more