Corporate presentation
Logotype for Silverco Mining Ltd

Silverco Mining (SICO) Corporate presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Silverco Mining Ltd

Corporate presentation summary

29 Sep, 2026

Project overview and resource estimate

  • La Negra is a fully permitted, 100% owned underground mine in Querétaro, Mexico, with a 2,500 tpd processing rate and a 2,157 ha land package.

  • The July 2026 mineral resource estimate reports 15.23 Mt indicated at 106 g/t Ag and 2.26 Mt inferred at 92 g/t Ag, with significant copper, lead, and zinc credits.

  • Updated geologic modeling has improved continuity of high-grade Ag-Cu-Pb-Zn mineralization.

Economic highlights and financial metrics

  • After-tax NPV (5%) is $329M, with an after-tax IRR of 131% and a 2.0-year payback period.

  • Life-of-mine (LOM) production is 4.1 Moz AgEq annually over 8.2 years, with a peak of 5.0 Moz AgEq in 2033.

  • Average LOM AISC is $24.86/oz AgEq, with $20.9M growth capex and $68.3M sustaining capex.

  • Undiscounted after-tax cash flow totals $439M, with a maximum cash requirement of $12.5M repaid by 2028.

Revenue, production, and cost structure

  • Silver accounts for 65% of LOM payable revenue, with zinc, copper, and lead contributing the remainder.

  • Annual production averages 4.1 Moz AgEq, with AISC declining from $55.83/oz in 2026 to $19.50/oz by 2033.

  • Mining costs average $36.07/t, processing $23.43/t, and total site AISC is $24.86/oz AgEq.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Silverco Mining