Sunstone Metals (STM) Investor presentation summary
Event summary combining transcript, slides, and related documents.
Investor presentation summary
4 Nov, 2026Portfolio strategy
Two Ecuador gold-copper projects positioned as large, long-life, low-cost assets, with value creation through exploration, resource growth and scalable development.
Bramaderos: 87.5% interest; SolGold Canada, now a Jiangxi Copper subsidiary, holds 12.5%, loan-carried to commercial production.
El Palmar: 74.5% interest with a staged acquisition path to 100%; a staged acquisition agreement for nearby Verde Chico is also signed.
Bramaderos
October 2026 MRE: 464Mt at 0.42g/t AuEq for 6.2Moz, including 3.3Moz Indicated; resource grew 72% and covers a 2km x 1.8km cluster.
Additional project-wide Exploration Target of 4.4-11.2Moz AuEq: 3.5-9.5Moz porphyry and 0.9-1.7Moz Limon; target is conceptual.
Copete-Porotillo discovery contributed 1.3Moz AuEq; every 2026 drill hole was mineralised from surface, with further drilling targeting a continuous open pit.
April 2026 Scoping Study cited a 1.4:1 mining strip ratio, surface mineralisation and multi-decade mining; September recovery estimates rose to >93% gold and >80% copper.
2026/27 work includes Melonal and Limon deep-target drilling, metallurgical testwork and environmental baseline programs.
El Palmar
Initial MRE: 64Mt at 0.60g/t AuEq for 1.2Moz, from near-surface drilling with potential starter-pit value.
Additional conceptual Exploration Target of 15-45Moz AuEq across 1.0-1.2Bt at 0.3-0.7g/t gold and 0.1-0.3% copper; based on three of five identified targets.
T2 and T3 targets extend beyond 1,750m depth; T3 drilling returned 190m at 0.58g/t AuEq and 251m at 0.56g/t AuEq.
Located on the Toachi Fault near major copper-gold deposits; Hancock committed US$120m to earn 49% in an adjacent JV with state-owned ENAMI.
Deeper-target drilling and surface exploration at adjacent Verde Chico are identified as upcoming exploration activities.
Latest events from Sunstone Metals
- Bramaderos rose to 6.2Moz AuEq as El Palmar drilling resumed amid a 1.8-quarter funding runway.STM
Q1 2027 TU - Bramaderos reaches 6.2Moz AuEq as two Ecuador projects advance resource growth and deeper exploration.STM
Investor presentation - Bramaderos resource up 33% to 3.6Moz AuEq; strong funding supports ongoing exploration.STM
H2 2026 - Bramaderos resource growth and improved recoveries lead 2026 catalysts; El Palmar deep drilling resumes.STM
Resources Rising Stars Gold Coast Conference - Strong exploration results and new funding position the company for resource growth in Ecuador.STM
Q4 2026 TU - Major gold-copper projects in Ecuador advance with strong growth, low costs, and robust exploration.STM
Noosa Mining Conference 2026 - 23-year mine life, US$0.9B NPV, low costs, and major upside from resource growth.STM
Investor update - Resource growth in Ecuador, $2.3M loss, cash down to $2.7M, further capital raised for exploration.STM
H2 2024 - Resource upgrades and new discoveries drive growth, despite a $2.4M net loss in FY2025.STM
H2 2025